My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989 - 01-23-89 Regular Meeting
public access
>
Clerk
>
MINUTES
>
1989
>
1989 - 01-23-89 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2009 3:23:15 PM
Creation date
4/16/2009 3:22:46 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E& <br />M <br />aocp; 12 ?!Gf 614 <br />jail were brought up for consideration and the Board authorized Chairman <br />Cox and Commissioner Wicker to talk with the architects about <br />air-conditioning at the present jail. <br />The Board discussed the cablevision franchises and it was <br />suggested that the present operators be requested to run their programs in <br />the local paper. <br />The Board reviewed a letter received from Mr. Archie Dalrymple. <br />It was the opinion of the Board that certain electrical connections with <br />disconnects would have to be installed in the retail space in the County <br />Office Building before it could be occupied by tenants. It is proposed that <br />in leasing the space the tenant would put in the wiring to the rented <br />space. <br />The Board noted that they had received a memorandum from Mrs. <br />Norma Bullard, County Tax Supervisor, about the 1988 personal property <br />listings for Trion. The matter was reviewed and no formal action was taken. <br />Commissioner Gordon A. Wicker reported to the Board that he had <br />received a report that showed that Floyd Browne and Associates had secured <br />all necessary approvals from State agencies to construct the water plant in <br />connection with the Golden Poultry project. <br />Commissioner John R. Dossenbach, Jr. brought to the Board's <br />attention that County Manager Fields, in order to perform her duties as <br />County Manager, had lost some vacation time and he was prepared to make a <br />motion that she be restored with lost time. The Chairman requested that he <br />withhold his motion until the Board had selected a new County Manager, in <br />order that they might consider the matter when her services as County <br />Manager were terminated. <br />With respect to the City of Sanford having collected a building <br />permit for the construction of the Pioneer Yarn plant in Lee County, County <br />Manager Fields reported that she had not received any transfer from the <br />City of Sanford. The Board requested that she have the activities <br />documented in writing but took no further action. <br />The Chairman read to the Board a letter from Mr. Donn Gunderson, <br />Director of the Department of Social Services to Mrs. Alice Hairston <br />concerning the distribution program which she conducts. No formal action <br />was taken. <br />Chairman Cox reported that he had received requests that the <br />vacancies on the Johnston-Lee Community Action Board be filled. After <br />discussion among the Board about these vacancies, Chairman Cox requested <br />Commissioner Stafford to name one person to serve and Commissioner Matthews <br />to name the other person to serve on this Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.