My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989 - 07-10-89 Regular Meeting
public access
>
Clerk
>
MINUTES
>
1989
>
1989 - 07-10-89 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2009 11:59:50 AM
Creation date
4/16/2009 11:57:35 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LM <br />tb4 12 PA,r 831 <br />WHEREAS, it is proposed to utilize $25,000 in spot stabilization on <br />unpaved roads in the county as determined by need, to include SR 1369, SR <br />1425, SR 1450, SR 1463, SR 1545, and SR 1315. <br />WQHEREAS, it is proposed to utilize $70,000 to pave down the <br />Subdivision/Residential Priority List as far as possible under funding and <br />right of way constraints. Initial paving projects anticipated: <br />PRIORITY 1 Base, pave, and erosion control - SR 1583 from SR 1551 <br />to Dead End - 0.14 mile. Estimated cost - $10,000.00. <br />PRIORITY 2 Grade, drain, base, pave, and erosion control - SR 1391 <br />from SR 1335 to Dead End - 0.20 mile. Estimated Cost - $13,000.00 <br />PRIORITY 3 SR 1164 from SR 1163 to SR 1162. R/W Refusal. No <br />allocation. <br />PRIORITY 4 Base, pave, and erosion control - SR 1471 from end of <br />pavement to Dead End - 0.20 mile. Estimated Cost - $15,000.00 <br />PRIORITY 5 Base, pave, and erosion control - SR 1250 from SR 1251 <br />to Dead End - 0.37 mile. Estimated Cost - $25,000.00 <br />PRIORITY 6 Base, pave, and erosion control - SR 1196, SR 1197, and <br />SR 1224 in Tramway - 0.62 mile. Estimated Cost - $40,000.00; Initial <br />Allocation $7,000.00. <br />WHEREAS, it is proposed to utilize $12,737 to pave down the Rural <br />Priority List as far as possible under funding and right of way constraints. <br />Initial paving projects anticipated: <br />PRIORITY 1 Grade, base, pave and erosion control - SR 1314 from sR <br />1007 to SR 1313 - 1.20 miles. Estimated cost $95,000.00. Initial Allocation - <br />$12,737.00. <br />WHEREAS the North Carolina Department of Transportation anticipates <br />an additional allocation of $120,976 Secondary Construction Funds for Lee <br />County subject to the approval of the Highway Trust Fund Bill. <br />WHEREAS it is proposed to utilize $33,000 to pave down the <br />Subdivision/Residential Priority List as far as possible under funding and <br />right of way constraints. Additional paving projects anticipated: <br />PRIORITY 6 Base, pave, and erosion control - SR 1196, SR 1197, and <br />SR 1224 in Tramway - 0.62 mile. Complete Funding. Total Allocation - <br />$40,000.00. <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.