Laserfiche WebLink
OK 12 rr„~ 94 <br />PLUMBING CONTRACT <br />J. J. Barnes, INC. <br />Fayetteville, NC <br />Base Bid 174,280 <br />HVAC CONTRACT <br />Bass Air Conditioning <br />Fayetteville, NC <br />Base Bid 325,000 <br />ELECTRICAL CONTRACT <br />Illumelex Electrical Co. <br />Raleigh, NC <br />Base Bid 288,700 <br />Alternates <br />E 3 Sound Systems (2) 40,700 <br />TOTAL 329,400 <br />TOTAL CONSTRUCTION CONTRACTS 3,277,804 <br />The following is a summary of project cost and sources of <br />funding: <br />Total Construction Cost 3,277,804 <br />Contingency Fund 62,497 <br />Architect/Engineering Fees 187,200 <br />Printing 2,125 189,325 <br />Soil Test, Topo, Etc. 7,841 <br />Demolition 20,600 280,263 <br />TOTAL PROJECT COST 3,558,067 <br />Funding: <br />State Appropriation 112,500 <br />State Appropriation 1,000,000 1,112,500 <br />Local (Financed) 2,000,000 <br />Local (Lee Co. Motel Occ. Tax) 164,547 2,164,547 <br />Local (CCCC Reserve) 281,020 <br />TOTAL FUNDS AVAILABLE 3,558,067 <br />The Tabulation of the bids taken September 21, 1989 are <br />attached to these minutes and by this reference made a part <br />hereof. <br />Commissioner Matthews moved that the Board accept CCCC's <br />2 <br />