Laserfiche WebLink
016 <br />0 <br />LOTTERY FUNDS Revised 9-29-08 <br />1 West Lee Middle <br />Chiller <br />S <br />43,000.00 <br />2 Lee Co. High <br />Roof - Admin <br />$ <br />162,000.00 <br />3 Lee Co. High <br />Roof - Library <br />$ <br />162,000.00 <br />4 B. T. Bullock <br />HVAC Controls <br />$ <br />125,000.00 <br />5 Tramway <br />HVAC Controls <br />$ <br />125,000.00 <br />6 East Lee Middle <br />HVAC -Cooling Tower <br />$ <br />38,000.00 <br />7 Broadway <br />New Service Gym / Aud. <br />$ <br />50,000.00 <br />8 J.Glenn Edwards <br />HVAC - replacement - controls <br />$ <br />205,619.00 <br />9 J. R. Ingram <br />HVAC - replacement - controls <br />$ <br />205,619.00 <br />10 Greenwood <br />HVAC - replacement <br />$ <br />110,381.00 <br />11 West Lee Middle <br />Roof - Band / Gym Area <br />$ <br />97,000.00 <br />12 Deep River <br />Replace carpet w/ floor tile classrooms <br />$ <br />28,000.00 <br />13 Broadway <br />Replace carpet w/ floor tile classrooms <br />$ <br />28,000.00 <br />14 Tramway <br />Painting - Classrooms, Gym <br />$ <br />21,000.00 <br />15 8. T. Bullock <br />Drainage - Landscaping <br />$ <br />40,000.00 <br />16 Bragg SL Academy <br />Roof drainage system <br />$ <br />25,000.00 <br />TOTAL LOTTERY FUNDS $ 1,465,619.00 <br />191 <br />