My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990 - 01-16-90 Regular Meeting
public access
>
Clerk
>
MINUTES
>
1990
>
1990 - 01-16-90 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2009 4:09:28 PM
Creation date
4/15/2009 4:09:07 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® aoo< 13 ~~eE 34 <br />CONSTRUCTION CONTROL CORPORATION <br />707 Cxtawbe Street • P.O. Boa 50528 • (803) 771.4648 <br />Colurnb4a, South Caroline 292500529 <br />LEE COUNTY, NORTH CAROLINA <br />Construction Costs Only <br />January 10, 1990 <br />Detention Center <br />Core 9,854 s.f. x = <br />Housing 15.145 s.f. X = <br />241999 100 2,499,900 <br />Beaufort County's combined square footage ran $102.59/s.f. - Higher cost in <br />Beaufort due to piling, exterior finish, wind design, etc. <br />Lee County costs would be slightly elevated because of small size of facility even <br />with law Enforcement Center and Courthouse, the special construction required by <br />the Detention Center will be slightly more costly, <br />Robeson - <br />Ilousing $87 (lot of dorm area) <br />Core $70 <br />(based on 51,520 and 47,076 respectively) <br />Sheriff's Area <br />if part of Jail construction and not a separate project. <br />10,000 s.f. x 65 = $650,000 <br />Courthouse <br />Recent Courthouse construction costs in Beaufort ran $5,100,000 for 50,000 s.f., or <br />$102/s.f. Courthouses generally range $ 80-110 per s.f. <br />41,000 s.f, x 95 = $3,895,000 <br />naleloh. NC Atlanta, GA <br />
The URL can be used to link to this page
Your browser does not support the video tag.