Laserfiche WebLink
4D K log 13 Pr,r,r <br />SCHEDULE D MANUFACTURED HOMES <br />The basic fee includes inspections for plumbing connections to <br />water and sewer supply, set-up, and anchoring inspections. <br />Electrical fees are calculated according to the size of service. <br />Mechanical permits not obtained in conjunction with the basic <br />permits listed below refer to Schedule B. <br />Single-Wide <br />Basic Fee <br />$ <br />25.00 <br />Double-Wide <br />Basic Fee <br />$ <br />35.00 <br />Triple-Wide <br />Basic Fee <br />$ <br />45.00 <br />Electrical <br />$ <br />25.00 <br />Mechanical <br />for Central Heating and A/C <br />$ <br />10.00 <br />SCHEDULE E NONRESIDENTIAL CONSTRUCTION <br />Includes commercial, industrial and non-residential buildings, <br />alterations and additions. <br />BUILDING <br />Building permit fee = $2.00 per $1,000 construction cost ($30.00 <br />per square foot for heated space, and $15.00 per square foot for <br />unheated space shall be used as a minimum square foot cost to <br />calculate building permit fees). <br />ELECTRICAL <br />Single and Three Phase: <br />Basic Fee $ 20.00 <br />Plus: 200 Amp $ 20.00 <br />Per 200 Amps over 200 Amps $ 10.00 Each <br />Each Apparatus $ 3.00 <br />PLUMBING <br />Basic Fee <br />Plus: <br />MECHANICAL <br />Basic Fee <br />Plus: Heat Pump <br />A/C Unit <br />Heating Unit <br />Gas Range, Water Heater, <br />Refrigerator <br />$ 20.00 <br />$ 3.00 per Fixture <br />$ 20.00 <br />$ 5.00 per Ton <br />$ 5.00 per Ton <br />$ 2.00 per 10,000 BTU <br />$ 2.00 per 10,000 BTU <br />