Laserfiche WebLink
13 pn'E ,`6 <br />SCHEDULE B OTHER RESIDENTIAL CONSTRUCTION <br />Includes all residential repairs, renovations, alterations, <br />additions, and other residential construction not listed <br />elsewhere. <br />BUILDING <br />Building permit fee = $2.00 per $1,000 construction cost ($90.00 <br />per square foot for heated space, and $15.00 per square foot for <br />unheated space shall be used as a minimum square foot cost to <br />calculate building permit fees). <br />Minimum Fee <br />ELECTRICAL <br />Residential repairs, renovations, <br />involving service changes refer to <br />Inspections. <br />Basic Fee <br />Plus: <br />Plus: <br />PLUMBING <br />Basic Fee <br />Plus: <br />MECHANICAL <br />Single Heating Unit <br />Single Air Conditioning <br />Single Combined Heating <br />Single Gas or Electric <br />Additional Units <br />Gas Connection Only <br />$ 20.00 <br />alterations, and additions <br />Schedule F Miscellaneous <br />$ 20.00 <br />$ 10.00 <br />$ 16.00 <br />$ 20.00 <br />$ 20.00 <br />$ 3.00 <br />$ 10.00 <br />per <br />per <br />per <br />per <br />per <br />per <br />60 Amps <br />100 Amps <br />125 Amps <br />200 Amps <br />Apparatus <br />Subpanel <br />$ 20.00 <br />$ 3.00 per Fixture <br />$ 25.00 <br />Unit $ 25.00 <br />and A/C Unit $ 35.00 <br />Package Unit $ 30.00 <br />$ 20.00 <br />$ 15.00 <br />SCHEDULE C MODULAR HOMES <br />The structural fee includes inspections for plumbing connections <br />to water and sewer supply. Additional permits shall be obtained <br />for basements, garages, and additional structural alterations in <br />accordance with the appropriate fee schedule. A permit is <br />required for central heating and air conditioning units in <br />accordance with Schedule A. <br />Structural $ 80.00 <br />Electrical $ 35.00 <br />