Laserfiche WebLink
NO, GENERAL CONSTRUCTION <br />* Ellis Wa <br />lker <br />Builders (11.9% MBE) <br />Base <br />Bid <br />406,707 <br />Alt. <br />G-1 <br />(add elevator) <br />44,500 <br />Alt. <br />G-2 <br />(finish rooms 49A thru 55A) <br />9,300 <br />Alt. <br />G-3 <br />(finish rooms 07B,08B, & 45A) <br />4,600 <br />Alt. <br />G-4 <br />(add 5 windows) <br />2,300 <br />Alt. <br />G-5 <br />(re-roof-Areas 4 & 5) <br />29,000 <br />Alt. <br />G-6 <br />(ceramic tile 4 toilets) <br />9,500 <br />505,907 <br />MECHANICAL <br />CONTRACTORS <br />* Southern Piping Company <br />Base <br />Bid <br />190,857 <br />Alt. <br />M-3 <br />(add economizer to AHU-1,2,& 3) <br />12,803 <br />203,660 ' <br />ELECTRICAL <br />CONTRACTORS <br />* Mace Electri <br />c Company <br />Base <br />Bid <br />104,000 <br />Alt. <br />E-1 <br />(add U/G Elec. Service) <br />3,710 <br />Alt. <br />E-2 <br />(finish rooms 49A thru 55A) <br />2,500 <br />Alt. <br />E-3 <br />(finish rooms 07B, 08B & 45A) <br />1,450 <br />Alt. <br />E-4 <br />(retrofit ewer. generator) <br />16,300 <br />Alt. <br />E-5 <br />(add economizer to AHU-1,2,& 3) <br />675 <br />Alt. <br />E-6 <br />(add elevator elec.) <br />1,870 <br />130,505 <br />SUBTOTAL <br />840,072 <br />*Denotes bid in complete compliance with contract documents <br />