My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 05-05-08
public access
>
Clerk
>
AGENDA PACKAGES
>
2008
>
Agenda Package - 05-05-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2009 11:12:44 AM
Creation date
4/3/2009 11:07:55 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Agenda
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
036 <br />Mr. John A. Crompton <br />® April 23, 2008 <br />Page 9 of 11 <br />o Change Order <br />o Certificate of Substantial Completion <br />o General and Supplemental general conditions <br />o Technical Specifications <br />• Issue written notice to proceed. <br />• Review Contractor submittals (shop drawings). <br />• Provide interpretation of construction plans. <br />• Review and verify Contractor's pay request. <br />• Prepare any required change order. <br />• Submit progress reports to the Owner. <br />• Provide construction administration and part-time construction <br />observation services (average 40 hours per week for 26 weeks). <br />• Schedule and conduct a final inspection. <br />• Provide certification that construction generally conformed to approved <br />plans and specifications. <br />• Provide one reproducible set of record drawings from the Contractor's <br />mark-up of as-built conditions to the Owner. <br />• Provide one set of record drawings from the Contractor's mark-up of as- <br />built conditions to NCDENR-Land Quality Section-Dam Safety. <br />III. BASIS FOR COMPENSATION <br />Fees will be invoiced monthly in accordance with the attached Schedule of Hourly Rates <br />and due upon receipt consistent with the enclosed General Terms and Conditions- As <br />discussed our fees are presented as Not To Exceed. We will not exceed the estimated <br />fees without prior approval from Client. A summary of the maximum fees for each of <br />the phases described above follows: <br />For Phase 1, Investigation and Preliminary Design services including geotechnical, the <br />Engineer shall be compensated a not to exceed fee of $ 42,380.00 including reimbursable <br />expenses. (Please note that our fee estimates include the topographic surveys and <br />geotechnical services). We have assumed that we will not need a barge to perform <br />geotechnical services. <br />For Phase 2, Design services, including the final dam safety report, design drawings and <br />specifications, and permit application packages; the Engineer shall be compensated a not <br />to exceed fee of $ 57,577.00 including reimbursable expenses. <br />E.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.