My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 01-07-08
public access
>
Clerk
>
AGENDA PACKAGES
>
2008
>
Agenda Package - 01-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2009 8:08:45 AM
Creation date
4/3/2009 8:05:47 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Agenda
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
633 <br />BUILDING PERMIT FEES <br />COMMERCIAL (continued) <br />] <br />COMMERCIAL <br />Modular Units. <br />(New) <br />Building Permit Fee: <br />Estimated Cost of Construction shalt be determined by multiplying the total gross building <br />square footage by the cost per square foot for Type of Occupancy listed below; <br />Permit Fee = Estimated Cost of Construction (from above) divided by $1,000, multiplied by 52 <br />Assembly <br />$80 <br />Business <br />$70 <br />Educational <br />$80 <br />Factor /Industrial <br />$80 <br />Hazardous <br />$80 <br />Institutional <br />$100 <br />Mercantile <br />$80 <br />Residential <br />$80 <br />Storage <br />$40 Heated <br />$35 Unheated <br />Utility and Miscellaneous <br />$40 Heated <br />$35 Unheated <br />Mixed Occu pane <br />Highest Cost per S .Ft. of Occupancy Types <br />OTHER <br />COMMERCIAL <br />Includes all Commercial Renovations, Repairs, and Other Commercial <br />CONSTRUCTION <br />Construction not listed elsewhere. <br />Permit Fee is Calculated based on Applicants Estimated Cost of Construction. <br />Building Permit Fee: <br />(Bid, quote, or estimate must be provided with permit application). <br />Building permit fee shall be calculated by: $2.00 per $1,000 of Applicants Estimated <br />Cost of Construction. <br />Minimum Building Permit Fee is $40M <br />I, <br />L& <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.