Laserfiche WebLink
® • Install rock baffle on upstream side to direct low flow into only one <br />barrel. <br />• Re-design outlet dissipater that will minimize rip rap length. Construct <br />new outlet dissipater and remove excess rip rap downstream of culvert. <br />Culvert #3: <br />Remove rip rap from stream bottom on upstream end of culvert. Rip rap <br />may be hand placed on stream banks in impacted area only. <br />Re-design outlet dissipator that will minimize rip rap length. Construct <br />new outlet dissipater and remove excess rip rap downstream of culvert. <br />Culvert #8: <br />• Remove rip rap from stream bottom on upstream end of culvert. Rip rap <br />e h ced on ream arled area only. <br />• e-de : n tl issip thaFew i i e 'p rap length. Construct <br />w o t ator mo ss ri rap downstream of culvert. <br />• est ch e ow strea c issi for (to end of original impact <br />area). The restoration will mimic original longitudinal grade and cross- <br />sectional geometry. <br />Proposed Schedule to Complete Restoration at Permitted Crossings <br />• Complete Detailed Design-6/15/06 <br />Complete Construction - 9/1/06 <br />Action Item #3: Restore Non-Permitted Roadway Stream Crossings <br />The three crossings of jurisdictional waters not permitted under the original nationwide <br />permit are Culvert ID #2, #5, and #6 (per the existing conditions map). During the recent <br />field visits by the USAGE, recommendations were provided to the County for restoration. <br />The following actions are proposed for these three non-permitted crossings: <br />Culvert #2: <br />Culvert #5: <br />Remove rip rap outlet dissipater as constructed. Install rip rap lined <br />`plunge pool' per USACE guidance. <br />Design an arch bridge to replace the existing 48" pipe (please see <br />enclosed schematic sketches of proposed bridge). <br />Design a stream restoration plan for the entire impact reach. The <br />restoration will mimic original longitudinal grade and cross-sectional <br />geometry. The bridge footings must be outside the restored stream bank. <br />Remove 48" pipe and rip rap channel and construct improvements. <br />-3- <br />