Laserfiche WebLink
(sous 13 Plrlr 900 <br />73 <br />DAVID R. POLSTON ! _ARCHITECT <br />1820 Chestnut Street <br />Wilmington, North Carolina 28405 <br />(919) 763-8687 <br />July 3, 1991 <br />Mr. William C. Stafford, Jr. Chairman <br />Lee County Board of commissioners <br />200 Wicker Street <br />Sanford, North Carolina 27331 <br />RE: Bid Results <br />Life Enrichment Center of Lee County <br />Sanford, North Carolina <br />Dear Mr. Stafford: <br />Bids for the construction of The Life Enrichment Center of Lea. <br />County were received on June 11, 1991. There were sufficient..bids <br />in all trades and bids.were opened in accordance with state <br />bidding procedures. The low bid was a single prime proposal from <br />Wayne Brothers, Inc. of Davidson, North Carolina for $874,000.00 <br />Since the bid, we have received a Contractors Qualification <br />Statement and an independent auditor's report of Wayne Brothers' <br />financial statement. Our analysis of these submittals indicates <br />that Wayne Brothers is qualified to perform the work required by <br />the construction documents. <br />The Building and Grounds committee requested that we investigate <br />possible cost savings. The following items were presented to and <br />approved by that committee for deductions from the construction <br />contract: <br />1) Change the brick allowance from $220 per thousand to $160 <br />per thousand. Deduct $3,150.00. <br />2) Change screen wall around dumpster pad from masonry to wood <br />construction. Deduct $1,514.00. <br />3) Delete Ice Guard from roofing requirements. Deduct <br />$2,395.00. <br />4) Delete skylight at foyer. Deduct $2,072.00. <br />5) Substitute ceiling light fixtures for wall fixtures in all <br />corridor:. Deduct $4,803.00. <br />6) The total deduction for these changes is $13,934.00. <br />Architecture, Planning, Design. <br />