Laserfiche WebLink
B0D`: 11 1At~ 1:19 <br />panying data and schedules, determine the amounts <br />owing to Contractor(s) and recommend in writing pay- <br />ments to Contractor(s) in such amounts; such reconn- <br />mendations of payment will constitute a representation <br />to OWNER, based on such observations and review, <br />that the work has progressed to the point indicated, <br />that, to the best of ENGINEER's knowledge, infor- <br />mation and belief, the quality of such %vork is in accor- <br />dance with the Contact Documents (subject to an eval- <br />uation of such work as a functioning I'roiccl upon Sub- <br />slanliad Completion, to the results of any subsequent <br />tests called lit in the Contract Documcnls, and to ;my <br />qualifications staled in his recommendation), ;old [hat <br />payment of the amount teconmmended is due cot <br />tractor(s); but by recommending any payment ENGI- <br />NEER will riot (hereby be deemed to have represented <br />that continuous or exhaustive examinations have been <br />made by ENGINEER to check Ute qualily of quantily <br />of the work or to review the scans, nnclhods, se- <br />quences, techniques or procedures of conslruclion or <br />safety precautions or programs incident Iherelo or that <br />ENGINEER has made an examinalion to ascertain <br />how of for what purposes ally Contractor has used the <br />moneys paid on account of the Contract Price, of that <br />title to any of the work, materials or equipment has <br />passed to OWNER tree and clear of any lien, claims, <br />security interests or encumbrances, or that Conlrac- <br />tor(s) have completed their work exactly in ,Iccofd;mce <br />with the Contract Documents. <br />SECTION 2-ADDITIONAL SERVICES OF <br />ENGINEER <br />2.1. General <br />If aulhorizcdin writing by OWNER, ENGINEER shall <br />furnish or obtain from olhcl:s Additional Services of <br />file hdlowing types which lire not considered normal <br />or cuslomary Basic Services except to the extent pro- <br />vided otherwise in Exhibit A "Further Description of <br />Basic Engineering Services and Related Matters"; <br />these will be paid for by OWNER as indicated in Sec- <br />tion 5. <br />2. L I. Preparation of applications and supporting <br />documents i'or governmental grants, loans or advances <br />in connection with the Project; preparation or review <br />of environmental assessments and impact statements; <br />review and evaluation of the effect on lire design re- <br />quncncnls of the Project of any such statements and <br />documents prepared by others: and assistance in ob- <br />lainingapprovalsofauthurilics havingjurisdiction over <br />the anticipated environmental impact of the Project. <br />2.1.2. Services to make measured drawings of or to <br />investigate existing conditions or facilities, or to verify <br />the accufacy of drawings or other information fur- <br />nished by OWNER. <br />1.6.6. Conduct an inspection to delermine if the Proj- <br />ect is substantially complete and a final inspection to <br />determine if the work has been completed in accor- <br />dance with the Contract Documents and if each Con- <br />tractor has fullilled all of his obligations thereumler so <br />that ENGINEER may recommend, in writing, final <br />payment to each Contractor and may give written no- <br />tice to OWNER and the Contractor(s) that the work is <br />acceptable (subject to any conditions therein ex- <br />pressed), but any such recommendation and notice <br />shall be subject to the limitations expressed in para- <br />graph 1.6.5. <br />1.6.7. ENGINEER shall not be responsithle for the <br />acts or omissions of any Contractor. of suhconl raclor, <br />or any of Ilnc Coll raclol(s)' or subcolilmdols, agcnls <br />or employees of any other persons (cxcepl 1,;N(,;I- <br />NFF.R's own employees and ngerls) al the site or olh- <br />crwise per lot using any of the Col lrrclor(s)' work: how- <br />ever, nothing conlaincd in lso;iglaplls 1.0.1 lluu 1.6.7. <br />inclusive, shall be conslrucd to release ENGINI~, 1;R <br />front liability for failure to propeiy pelfollo dillies un- <br />dertaken by him in the Conlfact Docuncuts. <br />2.1.3. Services resulting from significant changes in <br />extent of the Project or its design including, but not <br />limited lo, changes in size, complexity, OWNER's <br />schedule, or character of construction or method of <br />financing; and revising previously accepted studies, <br />reports, design documents or Contract Documents . <br />when such revisions are due to causes beyond ENGI- <br />NEER's control. <br />2.1.4. Providing renderings or models for OWNER's <br />use. <br />2.1.5. Preparing documents for alternate bids re- <br />quested by OWNER for Contractor(s)' work which is <br />not executed or documents for out-of-sequence work. <br />2.1.6. Invesligalions involving dclailcd consideration <br />of opcralions, maintenance and overhead expenses; <br />providing Value Engineering during the course of de- <br />sign: the preparation of fcasihilily studies, cash flow <br />and economic evalualiuns, rate schedules and apprais- <br />als: assistance in obtaining financing for the Project; <br />evaluating processes available for licensing and assist- <br />ing OWNER in obtaining process licensing; detailed <br />quantify surveys of material, equipment and labor; and <br />Page 4 of 20_ _ pages <br />