My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991 - 11-18-91 Regular Meeting
public access
>
Clerk
>
MINUTES
>
1991
>
1991 - 11-18-91 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2009 1:30:36 PM
Creation date
4/2/2009 1:28:43 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nok 1-9 146 <br />after Substantial Completion, the various miss ofconr <br />pensmiou provided lirr elsewhere in (his Agicemeni <br />shall be subject to renegolialion. <br />I I I. In Iheevenl that the work designed m specified <br />by ENGINEER is to be performed imdcr more Ihan <br />one prime contract, OWNFR and ENGINEER shall, <br />prior to conrnwnccmeut of the fi nd Design Phase, <br />develop a sdwdwc for pcrtbrmaucc of ENGINEER'S <br />services during the Final Design, Bidding or Negoli- <br />cling and Construction Phases in order to seyuen <br />and coordinate properly such services as applicable <br />the work under such separate contracts. This schedt <br />is to be prepared whether or not the work under su <br />contracts is to proceed concurrently and is to be i <br />eluded in Exhibit A "Further Description of Basic E <br />gincering Services and Related Matters," and the pr <br />visions ul paragraphs 4.4 through 4.10 inclusive, w <br />be moWhed accordingly. <br />The remainder of this page was left blank intentionally.) <br />I <br />Page 8 of _ 20, pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.