Laserfiche WebLink
~oo{ 1~1 ~r~ 598 <br />P.O. BOX 532 <br />SANFORD, N.C. 27330 <br />(919) 776-5622 <br />!r Don Mc Laughlin <br />)irector Lee County Parks and Recreation <br />'.0. Box 978 <br />;anford, N.C. 27330 <br />Ref: Engineering Proposal for Park Ave Park <br />)ear Don, <br />appreciate this opportunity to give you a proposal for <br />:he engineering service on Park Ave Park <br />'he following is a break down of the service and prices. <br />1) Construction drawings and technical specifications <br />Estimated 40 hrs. @ $ 30.00 per hr. _ $ 1,200.00 <br />2) Field Survey and Topo : Estimated 10 hrs field time @ <br />$ 50.00 = $ 500.00 <br />5 hrs. office time @ $ 35.00 = $ 175.00 <br />3) Demolition Plan: Estimated time 10 hrs. @ $ 30.00 <br />_ $ 300.00 <br />4) Lay out Plan : estimated time 20 hrs. @ $ 30.00 = <br />$ 600.00 <br />5) Grading , drainage and erosion control plan: Estimated <br />time 40 hrs. @ $ 30.00 = $ .1,200.00 <br />TOTAL $ 3,975.00 <br />Again I appreciate this opportunity to give you this proposal. <br />have had experience in the design for and layout of Park Systems. <br />did a portion of the design for O.T. Sloan Park and San Lee Park. <br />also did the total design of the recreation park at Seven Lakes <br />>ubdivision in Moore County. <br />If you have any questions please feel free to give me a call. <br />Robert J. Bracken , P.E. <br />a7 <br />3 <br />