Laserfiche WebLink
ti~~K 1:4 lltfC 791 <br />WHEREAS, It is proposed to retain $21,460 of Secondary Road <br />Construction Funds and $7,381 of Secondary Road Trust Funds for a <br />total of $28,841 for small projects that may come up during the year <br />such as road additions, property owner participation projects, <br />volunteer fire department drives, county-wide surveys, overdrafts, <br />etc. <br />WHEREAS, The North Carolina Department of Transportation is <br />required to pave 2.08 miles in Lee County during the Fiscal Year <br />1992-93 in order to meet the goals on the 1989 Highway Trust Fund <br />Legislation and, the 1992-93 Secondary Road Construction Program <br />proposal to pave 2.20 miles; and therefore, the remainder of funds <br />received in addition to the $233,841 be utilized for paved secondary <br />road improvement projects and in spot stabilization of unpaved <br />secondary roads. <br />WHEREAS, It is proposed to utilized $60,000 of Secondary <br />Road Construction Funds and $65,000 of Secondary Road Trust Funds for <br />a total of $125,000 to pave down the Rural Priority List as far as <br />possible under funding and right of way constraints. Initial paving <br />projects anticipated: <br />PRIORITY 5 - Survey, Right of Way Acquisition, Grade, <br />Drain, Base, Pave, and Erosion Control - SR 1430 from SR 1466 to <br />Dead End - 0.80 mile <br />Secondary Road Trust Fund <br />Estimated Cost & Allocation - $65,000 <br />PRIORITY 6 - Survey, Right of Way Acquisition, Grade, <br />Drain, Base, Pave, and Erosion Control - SR 1159 from EOP to SR 1144 <br />1144 - 0.60 miles <br />Secondary Road Construction Fund <br />Estimated Cost & Allocation - $60,000 <br />PRIORITY 7 - Survey, Right of Way Acquisition - SR 1545 <br />from SR 1547 to SR 1538 - 1.20 miles <br />Secondary Road Construction Fund <br />Estimated Cost - $100,000 <br />Balance from 1991-92 Funds - $15,000 <br />WHEREAS, It is proposed to utilize $80,000 of Secondary <br />Road Construction Funds to pave down the Subdivision Priority List as <br />far as possible under funding and right of way constraints. Initial <br />paving projects anticipated: <br />PRIORITY 20 - Survey, Right of Way Acquisition, Grade, <br />Drain, Base, Pave, and Erosion Control - SR 1206 from NC 78 to Dead <br />End - 0.25 miles <br />02 <br />2 <br />