My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 08-13-07 (Finance)
public access
>
Clerk
>
AGENDA PACKAGES
>
2007
>
Agenda Package - 08-13-07 (Finance)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2009 10:56:33 AM
Creation date
3/26/2009 10:53:02 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Agenda
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central <br />Carolina <br />ommunity <br />VACollege <br />OFPtCE OFTHE PRESIDENT <br />1105 EON, Drive • Smdord. E.C. 35330 <br />919-71S-7346 • Ins 919-7 IS 7450 <br />BEEFING CHATHAM. LEE S Hr1REP.TT COUNTIES <br />Central Carolina Community College <br />Construction Needs <br />August 1, 2007 <br />The following two buildings are needed and will be built on the land <br />recently acquired across Kelly Drive from the campus when funds can be <br />obtained. <br />Replacing Jonesboro Center with a new Continuing Education Center: <br />4,000 students attend this center in the average year. The building is old, <br />very expensive to heat and cool, very difficult to ensure security for students <br />and equipment, and substandard in numerous ways. <br />40,000 sq. ft. @ $200 per sq. ft. = $8,000,000 <br />0 <br />New Allied Health Education Center: <br />Most of the medical providers in our community, including Central Carolina <br />Hospital, are experiencing a shortage of nurses and other medical support <br />personnel. CCCC cannot increase enrollments with current facilities, which <br />are at maximum usage. The new building will increase the number of <br />graduates in nursing, medical assisting, certified nurse assisting, <br />phlebotomy, as well as making it possible to add new medical specialties. <br />40,000 sq. ft. @ $235 per sq. ft. = $9,400,000 <br />(The cost per sq. ft. is higher because the cost of laboratories is higher in a medical <br />training center.) <br />Prices take into account the current construction costs inflation rate of <br />approximately 8 - 9% per year. This is an approximate cost if construction <br />begins in 2009. <br />Lee Early College High School: <br />The two buildings above would relieve crowding on the campus, and <br />o provide additional space options to accommodate this new high school <br />which will grow to 400 - 500 students by 2010. <br />r~ v. I 1' ~ pao~c2 0 ~ <br />a rYU4 I'~,goo.ooo <br />
The URL can be used to link to this page
Your browser does not support the video tag.