Laserfiche WebLink
A. Scope of Technical Services - Permit Amendment <br />- Waste acceptance and disposal requirements <br />- Cover material requirements <br />- Vector control <br />- Explosive gases control <br />- Air quality compliance <br />- Access and safety requirements <br />- Erosion and sedimentation control requirements <br />- Drainage control and water protection requirements <br />- Liquids restrictions <br />- Recordkeeping requirements <br />- Spreading and compacting requirements. <br />Task Deliverables: Completed Operation Plan for submittal to the NCDWM. <br />Key <br />Understandings: Close coordination with County staff is anticipated during preparation of the <br />Operation Plan, in order to incorporate into the Plan the preferences of the staff. <br />The Operation Plan will be used as the base document for staff training. <br />Planned Meetings: <br />Information and <br />Services Provided <br />by Others: <br />4. Updated CI <br />Objective: <br />Meetings will be incorporated into Task 6 below. <br />Input from County staff regarding operational preferences. <br />osure and Post-Closure Plan <br />To prepare an updated Closure and Post-Closure Plan for approval by the <br />NCDWM. <br />RSG Activities: A written Closure Plan will be prepared that describes the steps necessary to <br />close all MSWLF units at any point during the active life of the facility. The <br />following key elements comprise the Closure Plan: <br />Description of the final cover system and procedures to be used during <br />installation <br />An estimate of largest area of the unit requiring final cover <br />An estimate of maximum inventory of wastes on-site over the active life <br />of the facility <br />Schedule for completing all closure activities. <br />A written Post-Closure Plan will be prepared that describes the steps necessary <br />for the 30-year post-closure care of the facility. The following key elements <br />comprise the Post-Closure Plan: <br />• Description of the monitoring and maintenance activities required and <br />the frequency to be performed <br />• Name, address and telephone number of the office to contact during the <br />® post-closure period <br />• Description of the recommended planned uses of the property during the <br />post-closure period. <br />Richardson Smith Gardner & Associates July 2007 <br />Scope of Technical Services - Permit Amendment Page A-3 <br />