Laserfiche WebLink
A. Scope of Technical Services - Permit Amendment <br />® Planned Meetings: Meetings will be incorporated into Task 6 below. <br />Information and <br />Services Provided <br />by Others: Subcontracted surveying services. <br />Input from County staff. <br />2. Updated Construction Ouality Assurance (COA) Plan <br />Objective: To prepare an updated CQA Plan for the NCDWM approval and to serve as the <br />guidance document to insure quality construction of the landfill. <br />RSG Activities: The CQA Plan will follow the outline provided in Rule .0541 and the minimum <br />criteria established in Rule .0540. The CQA Plan will be prepared for the <br />construction of the C&DLF unit and related environmental control system <br />components. The plan will include the following key elements: <br />• Responsibilities and authorities of each organization <br />• Field and laboratory testing methodology <br />• Inspection activities and procedures <br />• Sampling frequencies, calibrations, and protocols <br />• Criteria for acceptance and rejection <br />• Procedures for test failures <br />® Documentation and reporting requirements. <br />Task Deliverables: Completed CQA Plan for submittal to the NCDWM. <br />Key <br />Understandings: A complete and well-prepared CQA Plan is the key to successful construction <br />monitoring and quality workmanship. <br />Planned Meetings: Meetings will be incorporated into Task 6 below. <br />Information and <br />Services Provided <br />by Others: None. <br />3. Updated Operation Plan <br />Objective: To prepare an updated Operation Plan for submittal to the NCDWM which <br />clearly depicts the daily operational procedures at the landfill. <br />PSG Activities: Prepare an Operation Plan for each phase of landfill development. The Plan will <br />include operation drawings and a narrative discussing the drawings and <br />providing a description of the facility operations. The Plan will relate the <br />following information: <br />® Operation drawings (proposed phasing) <br />Operation report, providing a narrative discussion addressing the <br />operational requirements of the landfill (Rule .0542), including: <br />Richardson Smith Gardner & Associates July 2007 <br />Scope of Technical Services - Permit Amendment Page A-2 <br />