My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 - 04-18-2011 Reg. Meeting
public access
>
Clerk
>
MINUTES
>
2011
>
2011 - 04-18-2011 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2011 2:19:23 PM
Creation date
5/9/2011 2:16:50 PM
Metadata
Fields
Template:
Admin-Clerk
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bcc; 24 i b0 <br />ARTICLE 10 <br />PAYMENT TO CONTRACTOR <br />10.1 Contractor shall be paid for the Services rendered and accepted in accordance with the <br />unit prices specified in the "Contractor's Price Proposal" attached hereto for eligible <br />debris. To receive payment under this Contract, Contractor shall submit an invoice to <br />the County's Representative for the debris hauled to each disposal site, which shall be <br />calculated from load tickets that are issued by County representative at each site. <br />Contractor shall be paid solely on the tickets issued and verified by the Monitor for the <br />County at the disposal facilities. All loads hauled shall be full and well compacted. When <br />a load is delivered, the driver shall provide the County's Monitor with the load ticket. <br />The Monitor at the disposal site will rate each load as a % of fully loaded capacity as <br />predetermined through truck or trailer bed measurement by the Monitor. <br />10.2 Contractor shall furnish and pay the cost of all the necessary materials and shall furnish <br />and pay for all the superintendents, labor, tools, equipment, transportation and perform <br />all other work required for the removal of all disaster debris, as defined herein, in strict <br />accordance with this Contract, and any amendments thereto and such supplemental <br />plans and specifications which may hereafter be approved. <br />10.3 Contractor acknowledges that the County will apply for FEMA and /or State assistance. <br />Therefore, Contractor represents that it will perform all Services hereunder in a manner, <br />time and place so as to insure and be consistent with such reimbursement by those <br />agencies to the County. County reserves the right to withhold amounts owed to County <br />by Contractor from any payments due to Contractor from County. <br />10.4 All invoices shall include at a minimum the following information: <br />• Contractors Name <br />• Contract Number <br />• Project Worksheet Number (PW H) <br />• Disaster Number <br />• Location and /or site of work <br />• Category of Work (FEMA Categories A -G) <br />• Period Covered <br />• Brief description of type of work performed <br />• Debris Quantities and Type <br />All invoices shall be delivered to the monitoring firm first for review. No invoice shall <br />have either multiple PW f#'s or Category of Work or be for a period exceeding 30 days. <br />Page <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.