My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 - 04-18-2011 Reg. Meeting
public access
>
Clerk
>
MINUTES
>
2011
>
2011 - 04-18-2011 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2011 2:19:23 PM
Creation date
5/9/2011 2:16:50 PM
Metadata
Fields
Template:
Admin-Clerk
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All debris shall be subject to inspection by the County. Inspections will be to insure <br />compliance with the contract and applicable local, state and federal laws. The <br />Contractor will, at all times, provide the County access to all work sites and disposal <br />areas. The Contractor and the County will have in place at the DMS personnel to verify <br />and maintain records regarding the contents and cubic yards of the vehicles entering <br />and leaving the DMS(s). The Contractor will assist the County in preparation of any <br />required FEMA and state reports for any potential reimbursement through the training <br />of County employees and the review of documentation prior to submittal. The <br />Contractor will work closely with the County to ensure that eligible debris collection and <br />data documenting appropriately address concerns of any likely reimbursement agencies <br />including but not limited to the North Carolina Division of Emergency Management, <br />FEMA and other applicable state and federal agencies. <br />3.15 WORKSITES <br />The County will establish and approve all sites that the Contractor will be allowed to <br />use. The Contractor will remove all eligible debris and leave the site from which debris <br />was removed in a clean and neat condition. The condition of the work site shall be equal <br />to the original condition of the site. <br />3.16 NON- DISASTER RELATED DEBRIS <br />The Contractor shall not be required or paid to remove, process or dispose of debris <br />that is unrelated to disaster damage. <br />3.17 TECHNICAL SUPPORT <br />Contractor shall provide to the County disaster recovery technical program <br />management assistance relating to reimbursement of eligible damage costs from <br />federal and state agencies when available. <br />ARTICLE 4 <br />DOCUMENTATION AND REPORTING <br />4.1 Load Tickets: A "load ticket" will be utilized as the primary debris tracking document. <br />The form of the ticket shall be approved by the County and shall include at a minimum <br />the following information: <br />• Ticket Number <br />• Contract Number <br />• Date <br />• Contractor Name <br />• Loading Location <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.