My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 01-03-11
public access
>
Clerk
>
AGENDA PACKAGES
>
2011
>
Agenda Package - 01-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 10:13:11 AM
Creation date
2/17/2011 10:09:49 AM
Metadata
Fields
Template:
Admin-Clerk
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
632 <br />2. Project Cost and Funds: ORIGINAL <br />• <br />Costs <br />Construction <br />$ <br />130,6G0 <br />- 4000 LF 6" PVC water main: $72,000 <br />32,040 <br />- 40 As halt atch: $2,000 <br />- 2 6" ate valves: .$3,000 <br />- 3 fire h drants: $6,000 <br />- 200 trench rock excavation: $15,000 <br />- 100 select backfill: $1,200 <br />- 100 stone trench stabilization: $2,000 <br />- 16 water services: $9,600 <br />- 1,000 fittin s: $5,000 <br />- 8 drivewa re airs: $5,800 <br />,000 <br />- 1 6" tie: $5,000 <br />- Erosion control: $5,000 <br />Conlin en <br />6,600 <br />Prelin Engineering Report <br />5,000 <br />Basic services <br />14,000 <br />Resident inspection <br />4,000 <br />Dotal Project Costs $ 160,200 <br />\J <br />Finandna Source(s) <br />NC Rural Center <br />$ <br />128,160 j <br />Lee County <br />32,040 <br />A—.--f <br />Total Project Financing $ $160,200 <br />Project Cost and Funds: AMENDED <br />Costs <br />Total Project Costs $ 99,974.50 <br />• <br />Financine Source(s) <br />A.nn ...,4 <br />�NC Rural Center _ <br />$ <br />4.50 <br />5 LF 6 "PVC water me <br />9 997 45 <br />h drants: $13,200 <br />ate valves: $1,480 <br />x 22 -1 /2 bend: $568 <br />R <br />lu : $200 <br />MM9,D <br />halt, ravel, dirt driv hort <br />side 3 /4" service <br />side 3 /�' service to <br />ort side 1" to : $894 <br />Contingency <br />,000 <br />Total Project Costs $ 99,974.50 <br />• <br />Financine Source(s) <br />A.nn ...,4 <br />�NC Rural Center _ <br />$ <br />89,977.05 <br />Lee County <br />9 997 45 <br />Total Project Financing $ 99,974.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.