Laserfiche WebLink
BOOK 23 PAGE 88 8 c 3 J <br />2. Project Cost and Funds: ORIGINAL <br />Costs <br />Construction <br />$ <br />Vu 130,600 <br />- 4000 LF 6" PVC water main: $72,000 <br />9,997.45 <br />- 40 As halt atch: $2,000 <br />- 2 6" ate valves: $3,000 <br />- 3 fire h drants: $6,000 <br />- 200 trench rock excavation: $]5,000 <br />- 100 select backfill: $1,200 <br />- 100 stone trench stabilization: $2,000 <br />- ]6 ,services: $9,600 <br />- 1,000 fitfin s: $5,000 <br />- 8 driveway repairs: $4,800 <br />9,000 <br />- 116" tic: $5,000 <br />- Erosion control: $5,000 <br />Contingena <br />6,600 <br />Preliminary Engineering Report <br />5 <br />Basic services <br />14,000 <br />Resident inspection <br />4,000 <br />Total Project Costs $ 160,200 <br />rmanan �,ource(s) Amount <br />NC Rural Center $ 128,160 <br />Lee County I 1 11 X11 <br />Total Project Financing $ $160,200 <br />Project Cost and Funds: AMENDED <br />Costs <br />e. -, <br />C%6" <br />$ <br />90,974.50 <br />6" PVC water main: $60,658.50 <br />9,997.45 <br />rants: $13,200 <br />valves: $1,480 <br />-1 /2 bend: $568 <br />: $200 <br />- Asphalt, gravel, dirt driveway repair: $1,664 <br />- 10 short side 3 /4" service taps: $6,890 <br />- 5 long side 3 /4" service taps: $5,420 <br />- 1 short side 1" tap: $894 <br />Contin <br />9,000 <br />I otal Project Costs $ 99,979.50 <br />Financine Source(s) <br />A _ <br />NC Rural Center <br />$ <br />89,977.05 <br />Lee County <br />9,997.45 <br />I otal Project Financing $ 99,974.50 <br />