Laserfiche WebLink
B\ON 18 PwGE ~c3v <br />A. Unpaved Rural Roads. <br />PRIORITY IF Grade, Drain, Base, Pave and Erosion Control - Judson Road - <br />SR 1544 from SR 1543 to County Line - 0.40 mile <br />Secondary Road Construction Fund <br />Estimated Cost and Allocation $120,000 <br />PRIORITY 2F Grade, Drain, Base, Pave and Erosion Control - Nickolson Road - <br />SR 1 166 from SR 1001 to the Dead End - 0.60 mile <br />Secondary Road Trust Fund <br />Estimated Cost and Allocation $165,000 <br />PRIORITY 3F Grade, Drain, Base, Pave and Erosion Control - Cashion -Cletus Road- <br />SR 1504 from SR 1500 to Begin Pavement- 1.30 miles <br />Estimated Cost $325,000 <br />Secondary Road Construction Fund <br />2001-2002 Allocation $ 25,000 <br />Remaining $300,000 Allocation to be Funded from the <br />2002-2003 Secondary Road Program <br />B. Unpaved Subdivision Roads. <br />PRIORITY 1 Grade, Drain, Base, Pave and Erosion Control - Keller-Andrews Road- <br />SR 1 192 from End of Pavement to Dead End - 0.27 mile <br />Secondary Road Construction Fund <br />Estimated Cost and Allocation $ 75,000 <br />C. Retain approximately $25,762 of the Secondary Road Construction <br />Funds and approximately $46,973 of the Secondary Road Trust Funds for a <br />total of $72,735 for road additions, property owner participation projects, <br />rural volunteer fire department driveways, county wide surveys, <br />overdrafts, and other small projects. <br />