Laserfiche WebLink
BOOK i 9 NCE 459 <br />B. Unpaved Rural Roads. <br />t~ <br />~j <br />PRIORITY 1 F and 2F and are fully funded and are either paved or under design / construction. <br />PRIORITY 3F Grade, Drain, Base, Pave and Erosion Control - Cashion Cletus Road <br />SR 1504 From SR 1500 to End of Pavement - 1.30 miles <br />Estimated Cost $325,000 <br />Secondary Road Construction Fund <br />2001-2002 Allocation $10,000 <br />2002-2003 Allocation $155,000 <br />Remaining $160,000 Allocation to be funded in future Secondary Road <br />Programs. Begin construction 2003-2004. <br />PRIORITY 4F Grade, Drain, Base, Pave and Erosion Control - Iron Furnace Road <br />SR 1463 From SR 1403 to Dead End - 0.75 miles <br />Estimated Cost $175,000 <br />Secondary Road Construction Fund <br />2003-2004 Allocation $ 65,000 <br />Secondary Road Trust Fund <br />2002-2003 Allocation $ 50,000 <br />2003-2004 Allocation $ 60,000 <br />C. Retain approximately $26,819 of the Secondary Road Construction Funds and <br />approximately $3,627 of the Secondary Road Trust Funds for a total of $30,446 <br />and any additional or excess funds for road additions, property owner <br />participation projects, rural volunteer fire department driveways, county wide <br />surveys, overdrafts, and other small projects. <br />D. The 2002-03 Secondary Road Construction Program allocations were used in <br />determining the funds available for the 2003-04 Fiscal Year. Last year's <br />Secondary Trust Allocation was 70% of the anticipated funding due to revenue <br />shortfall and unexpected transfers to the general fund. An additional $41,785 <br />may be available as a Trust Fund Allocation for Fiscal Year 2003-04. Should this <br />contingency occur, any additional trust funds will be allocated to further fund the <br />following priorities: <br />PRIORITY 3F Cashion Cletus Road - SR 1504 <br />E. THIS PROGRAM IS SUBJECT TO AVAILABILITY OF FUNDING, RIGHT OF <br />WAY, AND ENVIRONMENTAL REVIEW <br />