My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 - 07-21-03 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2003
>
2003 - 07-21-03 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2009 10:28:36 AM
Creation date
2/26/2009 10:27:03 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK i 9 NCE 459 <br />B. Unpaved Rural Roads. <br />t~ <br />~j <br />PRIORITY 1 F and 2F and are fully funded and are either paved or under design / construction. <br />PRIORITY 3F Grade, Drain, Base, Pave and Erosion Control - Cashion Cletus Road <br />SR 1504 From SR 1500 to End of Pavement - 1.30 miles <br />Estimated Cost $325,000 <br />Secondary Road Construction Fund <br />2001-2002 Allocation $10,000 <br />2002-2003 Allocation $155,000 <br />Remaining $160,000 Allocation to be funded in future Secondary Road <br />Programs. Begin construction 2003-2004. <br />PRIORITY 4F Grade, Drain, Base, Pave and Erosion Control - Iron Furnace Road <br />SR 1463 From SR 1403 to Dead End - 0.75 miles <br />Estimated Cost $175,000 <br />Secondary Road Construction Fund <br />2003-2004 Allocation $ 65,000 <br />Secondary Road Trust Fund <br />2002-2003 Allocation $ 50,000 <br />2003-2004 Allocation $ 60,000 <br />C. Retain approximately $26,819 of the Secondary Road Construction Funds and <br />approximately $3,627 of the Secondary Road Trust Funds for a total of $30,446 <br />and any additional or excess funds for road additions, property owner <br />participation projects, rural volunteer fire department driveways, county wide <br />surveys, overdrafts, and other small projects. <br />D. The 2002-03 Secondary Road Construction Program allocations were used in <br />determining the funds available for the 2003-04 Fiscal Year. Last year's <br />Secondary Trust Allocation was 70% of the anticipated funding due to revenue <br />shortfall and unexpected transfers to the general fund. An additional $41,785 <br />may be available as a Trust Fund Allocation for Fiscal Year 2003-04. Should this <br />contingency occur, any additional trust funds will be allocated to further fund the <br />following priorities: <br />PRIORITY 3F Cashion Cletus Road - SR 1504 <br />E. THIS PROGRAM IS SUBJECT TO AVAILABILITY OF FUNDING, RIGHT OF <br />WAY, AND ENVIRONMENTAL REVIEW <br />
The URL can be used to link to this page
Your browser does not support the video tag.