My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORDINANCE - Lee County Budget Ordinance FY 17-18
public access
>
Clerk
>
ORDINANCES
>
ORDINANCE - Lee County Budget Ordinance FY 17-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2017 9:54:10 AM
Creation date
6/21/2017 9:49:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. INSPECTIONS <br />The General Contractor or the person that the Building Permit was issued to must make an inspection nequests. <br />(Footings, Foundations, Rough -Ins, Insulation, and Final for C.O.). Mecbical, Plumbing & Mechanical Contractors <br />will be responsible to notify the General Contractor when ready for Rough -In, Final, and other inspections. <br />"NOTE: When a construction vroiect MQ14 s All fam disciplines i.e. <br />Build�g �•� pi. bmg_and <br />Mechanical mstallatiorns, each disavhne will be mso ed 2JmulM262gft dursna one M&M -thrill, Inspection <br />requests should not be made unless each discipline is ready for a rough -in inspection, <br />A minimum of one (1) day notice is required for all inspections. <br />All inspections must be called in by the correct address and permit number. <br />Building Permit Cards must be posted and building puns must be available at the jobsite or the inspection will not be <br />performed and a SM PENALTY FEE WILL BE CHARGED. <br />Inspection results will be provided at all jobsites. Passed inspections will be indicated with the appropriate section of <br />the permit card posted on the jobsite. Failed inspections will be identified with the posting of a orange "NOTICE" <br />card accompanied by a "NOTICE OF ADDITION OR CORRECTIONS" sheet. The Inspector will provide these two <br />documents on the jobsite with the permit card. 4G.S.$ T5M-352 and G.S.S 160A-512). <br />Calls to the inspection department mneeming the status of inspections are discouraged. Check permit card at jobsite <br />for inspection results. <br />Priorities for daily inspection¢ wdll be as f0aws: <br />1. Cancrebg.pours. (i.e.f �and?s�a <br />2. ditches that are a _ o �' . �•w <br />Open p tent it danger '1�'the public. (i.e. water & sewer lines and underground electrical) <br />S. FoWWations. <br />4. Restoration of Mmtrical.Service t+o,"ting buildings. <br />5. Mechanical Change -Outs / Repairs ailing extreme weather conditions. <br />RE -INSPECTION FEES <br />The Inspections Department will perform one follow-up inspection to ensure that corrections have been made. <br />Additional inspections shah be termed "re inspections'. A fee of $60 shall be paid prior to any reinspection trip <br />Temporary service poles not inspected in conjunction with footing or foundation inspections will be considered a re- <br />inspection. There will be a $60.00 re -inspection fee charge if a scheduled inspection is not ready when the hmpec m <br />arrives on the jobsite. <br />Any inspection that requires that the owner provide access (ie. Building, Electrical, Mechanical and Plumbing) the re- <br />inspection fees will be as follows: <br />• 1s' Inspection Trip - No Charge. Door Hanger will be left instructing owner to schedule an inspection. <br />• 2^4 Inspection Trip, and subsequent trip will result in a $60 Re -Inspection Fees per Re4nspection Trip until <br />Inspection is approved. Contractor will be responsible for paying Re -Inspection Fees prior to any Re. <br />Inspections. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.