My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORDINANCE - Lee County Budget Ordinance FY 17-18
public access
>
Clerk
>
ORDINANCES
>
ORDINANCE - Lee County Budget Ordinance FY 17-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2017 9:54:10 AM
Creation date
6/21/2017 9:49:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANUFACTURED HOME PERMITS <br />A licensed Dealer or Setup Contractor must obtain Manufactured Home Permits. The owner is allowed to obtain a <br />manufactured home permit only if they are actually setting up the home themselves. <br />Any manufactured home moved to the site prior to issuance of the necessary permits required will be removed from <br />the site until such time that the proper permits are approved and issued. <br />Manufactured home plumbing permits are required for setup contractors who will complete the phimbing <br />connections underneath the home only. A North Carolina licensed p1 mbing contractor will be required to obtain a <br />separate permit to make utility connections (water/sewer). <br />MODULAR PERMITS <br />A building permit is required for modular homes. <br />In accordance with G.S. 87-1 and G.S. 143-139.1, any person, firm or corporation that undertakes to erect a modular <br />building must have either a valid North Carolina General Contractors License or provide a five thousand dollar ($5,000) <br />surety bond for each modular building to be erected. <br />The permit fee is for the modular setup (footing, foundation, and final). Additional budding permits shall be obtained for <br />porches, basements, garages, and additional structural Alterations; to the modulai unit in accordance with the permit fee <br />schedule. A separate permit is required for electrical, mechaniW and phmbmg permits. <br />NO TEMPORARY SERVICE WILL BE AUTHORIZED FOR ANY MODULAR CONSTRUCTION. <br />PLUMBING PERMITS <br />Plumbing permits PLre required for "The installation, extension, alteration or general repair of any plumbing system,- <br />Plumbing <br />ystem,Plumbing permits are issued to a properly licensed North Carolina Plumbing Contractor <br />OR <br />• To the owner of the building that occupies the building provided that the permit holder performs the work <br />themselves (no rental property or commercial projects). G.S. 87-21(a)(5)(H). <br />Permits will be issued personally to the license holder of record only. A bona fide employee of the licensee will be <br />allowed to purchase permits upon submittal of the "Authorization for Permit Application by Employee of Licensed <br />Contractor Form". <br />Manufactured home plumbing permits are required for setup contractors who will complete the plumbing <br />connections underneath the home only. A North Carolina licensed plumbing contractor will be required to attain a <br />separate permit to make utility connections (water/sewer). <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.