My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORDINANCE - Lee County Budget Ordinance FY 17-18
public access
>
Clerk
>
ORDINANCES
>
ORDINANCE - Lee County Budget Ordinance FY 17-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2017 9:54:10 AM
Creation date
6/21/2017 9:49:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRE PREVENTION PERMIT FEES <br />N 1�. , <br />Permits $ 50.00 each <br />Any required permits listed in Section <br />105 of the NC Fire Prevention Code <br />(Unless otherwise noted) <br />Routine Maintenance Inspections $ N/C <br />Fire Code Violations' $ 75.00 each <br />"(No charge if violations have been corrected by the scheduled re -inspection date) <br />CONSTRUCTION REMW spECTIONS <br />Plan Reviews" $ 50.00 each plus $0.02 per sq. ft. <br />Certificate of Occupancy $ N/C <br />Fire Protection Systems <br />(New and Renovations) <br />Sprinkler Systems"" $ 50.00 plus $0.02 per sq. ft. <br />Standpipes" $ z 50.00 plus $0.02 per sq. ft. <br />Fire Alarm Systems" $ 50.00 plus $0.02 per sq. ft. <br />Hood Systems** $ 75.00 <br />Paint Booths*" $ 100.00 <br />Other Extinguishing Systems" $ 100,00 <br />Re Test $ 100.00 <br />*Fire Code violations are per each Code Section that is not complaint ie. multiple exit signs out of service equals 1 <br />violation, multiple fire protection systems out of service equals multiple violations. <br />-Construction permits for all Fire Protection systems shall be subject to the plan review fees noted above. All construction <br />permits include first acceptance test as may be required. Re -test will be additional. <br />Permits will be renewed based upon the State mandated inspection schedule. AD required permit fees are valid until <br />change of occupancy use, ownership and/or tenant, or until revoked due to non-compliance. <br />OTHER PERMiT FEES <br />Exhibits and Trade Shows $ 25.00 each or $250.00 annually <br />Liquid or Gas Fueled VehiclevTquipment $ 25.00 each <br />(1n assembly buildings) <br />Temporary Membrane Structures $ 50.00 each <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.