My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-1-17 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2017
>
5-1-17 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 4:44:41 PM
Creation date
6/2/2017 4:40:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the event of a disaster, County may elect to remove debris with County forces, to activate <br />this Contract, or to contract separately for debris removal. <br />ARTICLE 7 <br />CONDITIONS OF WORK <br />The Contractor must inform himself fully of the conditions relating to the execution of the <br />project and the employment of labor thereon. Failure to do so will not relieve the Contractor of <br />his obligation to furnish all material and labor necessary to carry out the provisions of this <br />Contract. Insofar, as possible the Contractor, in carrying out his work, must employ such <br />methods or means as will not cause any interruptions of or interference with the work of any <br />other contractor(s). <br />ARTICLE 8 <br />LAWS AND REGULATIONS <br />All applicable state laws, municipal ordinances, and the rules and regulations of all authorities <br />having jurisdiction over the scope of work of the project shall apply to this Contract throughout, <br />and they will be deemed to be included in the contract the same as though herein written out <br />in full. <br />ARTICLE 9 <br />FORCE MAJEURE <br />It is mutually understood and agreed that the Contractor shall be waived of its obligations <br />under the contract during any period or periods of time when acts of God, war or public enemy <br />render impossible its performance under the contract. In such case, the Contractor shall give <br />the County prompt oral notification followed by written notice of the particulars and estimated <br />duration of said Force Majeure. <br />ARTICLE 10 <br />PAYMENT TO CONTRACTOR <br />10.1 Contractor shall be paid for the Services rendered and accepted in accordance with the <br />unit prices specified in the "Contractor's Price Proposal" attached hereto for eligible <br />debris. To receive payment under this Contract, Contractor shall submit an invoice to <br />the County's Representative for the debris hauled to each disposal site, which shall be <br />calculated from load tickets that are issued by County representative at each site. <br />Contractor shall be paid solely on the tickets issued and verified by the Monitor for the <br />County at the disposal facilities. All loads hauled shall be full and well compacted. When <br />a load is delivered, the driver shall provide the County's Monitor with the load ticket. <br />The Monitor at the disposal site will rate each load as a % of fully loaded capacity as <br />predetermined through truck or trailer bed measurement by the Monitor. The capacity <br />Page <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.