My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-10-17 Interlocal Meeting
public access
>
Clerk
>
MINUTES
>
2017
>
4-10-17 Interlocal Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 3:06:28 PM
Creation date
6/2/2017 3:05:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Update on STIP projects April 10, 2017 <br />APPROVED STIP <br />DRAFT STIP <br />Roadway/Segment Description and est. cost <br />R -O -W Const. <br />R -O -W Const. <br />Highway Projects <br />and 5K 3.579 p3roaawayRd/main <br />_Nt-42 <br />St), from US 421 (Horner Blvd) in <br />Sanford to SR 1538 (Harrington Ave) in <br />Widen to multi -lanes. $29.5 <br />Broadway. <br />million. <br />2018 <br />2020 <br />2018 <br />2020 <br />onve a -gra a intersection to <br />US 1/15/501, from south of NC 78 <br />grade separation and relocate NC <br />(Tramway Rd) to Pendergrass Rd in <br />78 to tie into interchange. $33.0 <br />Sanford. <br />million. <br />2020 <br />2020 <br />2020 <br />2020 <br />R 1 (Carthage St), from 9R--113T— <br />R11(Fire <br />(FireTower Rd) to NC 42 (Wicker St) in <br />Sanford. <br />Widen roadway. $13.3 million. <br />2020 <br />2022 <br />2020 <br />2022 <br />Keconstruct as a complete s r <br />with improvements such as <br />US 421 Business/NC 87 (Horner Blvd), <br />medians, sidewalks, bicycle <br />from US 1/15/501 to north of SR 1514 <br />facilities, and streetscaping. $32.3 <br />(Bragg St) in Sanford. <br />million. <br />2021 <br />1 2023 <br />2021 <br />2023 <br />US 1/15/501, rom US 15/501 (White <br />Hill Rd) to SR 1334 (Pendergrass Rd) in <br />Upgrade to superstreet. $38.5 <br />Sanford. <br />million. <br />Study Only <br />2023 <br />2026 <br />Non -Highway (Bike/Ped) projects <br />Reduce number of lanes and <br />US 1 Business (Carthage St), from NC 42 <br />construct bicycle/pedestrian <br />(Wicker St) to Chatham St in Sanford. <br />accommodations. $1.9 million. <br />Not in STIP <br />2020 <br />2021 <br />NC 4 (Wicker St), from West Lee <br />Middle School entrance to Kiwanis <br />Construct multi -use path. $0.5 <br />Family Park Greenway in Sanford. <br />million. <br />- <br />2018 <br />- <br />2018 <br />SR 1107 (Fields Dr), from SR 1237 <br />(Carthage St) to US 421 Business <br />(Horner Blvd) in Sanford. <br />Construct sidewalk. $0.9 million. <br />Not in STIP <br />2021 <br />2022 <br />SR 157Main St), from SIR 1531 <br />(Mansfield Dr) to end of existing <br />sidewalk in Broadway. <br />Construct sidewalk. $0.1 million. <br />Not in STIP <br />- <br />2020 <br />Woodland v, from Evergreen Ln to <br />Globe St in Sanford. <br />Construct sidewalk. $0.7 million. <br />Not in STIP <br />2022 <br />2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.