Laserfiche WebLink
Construction Field Representative 1 <br />$ 75.00 <br />Construction Field Representative II <br />$ 80.00 <br />Construction Field Representative III <br />$ 85.00 <br />Planner 1 <br />$ 95.00 <br />Planner II <br />$105.00 <br />Planner III <br />$125.00 <br />Planner IV <br />$135.00 <br />Surveyor 1 <br />$ 80.00 <br />Surveyor II <br />$ 90.00 <br />Surveying Associate 1 <br />$ 70.00 <br />Surveying Associate II <br />$ 75.00 <br />Survey Field Technician 1 <br />$ 55.00 <br />Survey Field Technician II <br />$ 60.00 <br />Survey Field Technician III <br />$ 65.00 <br />Administrative Assistant (1 -III) <br />$ 70.00 <br />Accounting Assistant (1-11) <br />$ 80.00 <br />1. EXPENSES <br />a. Mileage - $0.65/mile <br />b. Robotics/GPS Equipment - $25/hr. <br />c. Telephone, reproduction, postage, lodging, and other incidentals shall be a direct charge per receipt. <br />2. ASSOCIATED SERVICES - <br />a. Associated services required by the project such as soil analysis, materials testing, etc., shall be at cost plus <br />ten (10) percent. <br />2 Revised December 2015 <br />