Laserfiche WebLink
Mr. John Crumpton <br />March 24, 2017 <br />Page 7 <br />Additional Services: <br />Please note that the following services are not included in this proposal, and will be <br />considered Additional Services that can be provided if necessary in accordance with the attached <br />Basic Fee Schedule. <br />1. Contacting or coordinating service extensions to additional properties that are not <br />included on the 22 Affected Private Well Property Owners spreadsheet provided to <br />McGill by County staff. <br />2. Making revisions to design plans or technical specifications when such revisions are <br />inconsistent with approvals or instruction previously given by the County or City, or are <br />due to causes beyond the control of McGill Associates. <br />3. Preparing an estimate of fair market value for proposed easements. <br />4. Preparation of easement plats for service lateral extensions that do not cross an adjacent <br />parcel. <br />5. Attendance at more than two (2) field meetings with existing residences during the <br />easement negotiation process. <br />6. Construction surveying, which we assume to be the responsibility of the Contractor. <br />7. Geotechnical services before or during construction. <br />8. Preparation of Environmental Assessments or Environmental Information Documents. <br />9. Well testing services. <br />10. Legal services associated with proposed easements, which shall be provided by the <br />County's attorney of choice, and invoiced directly to the County. <br />11. Payment of regulatory permit application fees and payment of bid advertisement costs. <br />12. Providing services of other professional consultants for items of work other than those <br />outlined under Basic Services. <br />13. Preparing to serve and/or serving as an expert witness in connection with any public <br />hearing, arbitration proceeding or legal proceeding, other than as specified in the Basic <br />Services above. <br />14. Providing professional services made necessary by default of the Contractor in the <br />performance of the Construction Contract. <br />