My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-3-17 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2017
>
4-3-17 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 9:08:09 AM
Creation date
4/27/2017 9:06:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S0 9660 Falls of Neuse Road <br />Suite 138-236 <br />d �� S Raleigh, NC 27614 <br />^ <br />i <br />� V� (919) 539-6572 <br />Name / Address <br />Lee County <br />408 Summit Drive <br />Sanford, NC 27331 <br />Ship To <br />OT Sloan Pool <br />1420 Bragg Street <br />Sanford, NC 27331 <br />Estimate <br />Date <br />Estimate # <br />3/19/2017 <br />1012 <br />Description <br />Qty <br />Cost <br />Total <br />Pool Repair / Renovation -Install Two (2) Pentair 144296 42"x96" <br />1 <br />58,545.00 <br />58,545.00 <br />horizontal filter tanks with One (1) Pentair 155720 Dual Filter <br />manifold kit with butterfly valves. <br />-SAG will remove all sand and gravel from three (3) filter tanks <br />-SAG will remove One (1) existing filter tank for the dive well from <br />the filter room <br />-SAG will remove Two (2) filter tanks for the lap pool and dispose <br />-SAG will rig and install Two (2) new 42"x96" tanks for the lap <br />pool into the filter room. <br />-SAG will rig and install the One (1) existing filter tank for the dive <br />well. <br />-SAG will install the Dual Filter Manifold kit and re -plumb the filter <br />room to make the new tanks operational. <br />-SAG will install 700 lbs. of pea gravel and 2,800 lbs. of filter sand <br />each for three (3) filter tanks. <br />-SAG will make the system operational and train staff as to correct <br />operation of the new system once the pools are full and filtering. <br />-Payment terms to be negotiated based on equipment pre -payment <br />requirements. <br />-A 10% discount was provided by Pentair Pool to W.W. Adcock <br />and passed along through SAG to Lee County on this equipment. <br />***Filter Tank & Manifold Lead Time-8Weeks*** <br />Lee County 7.00% Sales Tax <br />7.00% <br />0.00 <br />Thank you for your business! Southeast Aquatics Group EIN:27-1646042 <br />Total <br />$58,545.00 <br />Customer Approval <br />gned <br />'60 -� /S/1 -7 <br />Printed Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.