Laserfiche WebLink
Mr. Kenneth Cole <br />July 1, 2004 <br />Page 2 of 2 <br />m"« <br />BOOK :.9 F'GE 'Ti <br />Additional engineering to include SCADA communications <br />Conetics, Inc. of Sanford designed a comprehensive SCADA system, retrofitting all lift stations in the <br />Sanford collection system to communicate to .a central location. Hydrostructures, PA was made <br />aware only very recently of this new system. We originally scoped our engineering effort with the <br />understanding that an autodialer was the only communication requirement for the proposed lift <br />station. Considerable additional services would be needed to incorporate the new SCADA system <br />into the proposed project, include it in bid documents and oversee its construction. While Conetics <br />has graciously. provided much information, Hydrostructures must sort through the information and <br />properly incorporate pertinent aspects into the project in a fashion that would allow us to competently <br />design, bid and inspect this component. <br />Fee Proposal: Engineering, specifications, quantity takeoffs, <br />incorporation into project drawings, construction inspection <br />Fee excludes radio reception survey or investigations at Harkey Road Tank <br />Drafting <br />2 <br />@ <br />$45/hr <br />= $90.00 <br />Engineer review <br />6 <br />@ <br />$90/hr <br />= $540.00 <br />Specification/takeoffs <br />12 <br />@ <br />$85/hr <br />= $1,020.00 <br />Construction inspection <br />12 <br />@ <br />$55/hr <br />= $660.00 <br />4 <br />@ <br />$90/hr <br />= 360.00 <br />Total <br />$2,670.00 <br />With your authorization, we will proceed with the tasks outlined above. Should you have questions, <br />please call me at 542-5002 ext. 3#. <br />Sincerely, <br />HYDROSTRUCTURES, P.A. <br />James N. Johnston, PE <br />Vice President, Engineering <br />Accepted By: <br />7/21/04 <br />Sign Date <br />Herbert A. Hincks <br />Print <br />