Laserfiche WebLink
ms consultants, inc. <br />CHANGE ORDER NO. 3 <br />OR Owner Request <br />DATE: May 20, 2004 CR Contractor Request <br />(X) DR Designer Request <br />PROJECT: Lee County Industrial Park Phase 2 CC Concealed Condition <br />Colon Road Pump Station and Sewer DE Design Error <br />DO Design Omission <br />CONTRACTOR: Sanford Contractors, Inc. SC Schedule Change <br />OT Other <br />Under the terms of the Contract and without invalidating the original provisions thereof, the following change(s) in <br />work is(are) authorized. <br />Change pump station driveway entrance per NCDOT comments: <br />Add: Remove approximately 110' of existing guardrail along Colon Road and attach <br />a MELT (Anchor Type 350) on south side of new driveway $2,350.00 <br />Deduct: Guardrail installation shown on original plans -$2,350.00 <br />Add: Asphalt first 20' of driveway and add 20' radii at Colon Rd intersection (43 SY) $1,640.00 <br />Deduct: 22 SY of gravel driveway -$190 <br />NET CHANGE ORDER No. 3 $1,450.00 <br />The contract amount is now as follows <br />Base Contract: <br />$1,251,108.00 <br />Change Order No. 1 <br />$12,500.00 <br />Change Order No. 2 <br />-$40,620.00 <br />Change Order No. 3 <br />$1,450.00 <br />NEW CONTRACT AMOUNT <br />$1,224,438.00 <br />Approved by: <br />ORTH CAROLINA, i.EF. COUNT`S <br />Srre-,,'ed for registr pion on the` day <br />2c(l at .,PM <br />recordin Book _Z_5_1_ Page _0 <br />Nellie W. Thomas, Register of Deeds <br />Uwner - Lee county <br />Herbert A. Hincks, Chairman <br />Lee Count), Board of Commissioners <br />