Laserfiche WebLink
- <br />19 wcF S% <br />ono <br />C 7 9 <br />ms consultants, inc. <br />CHANGE ORDER NO. 2 <br />OR Owner Request <br />DATE: May 20, 2004 <br />CR Contractor Request <br />(X) DR Designer Request <br />PROJECT: Lee County Industrial Park Phase 2 <br />CC Concealed Condition <br />Colon Road Pump Station and Sewer <br />DE Design Error <br />DO Design Omission <br />CONTRACTOR: Sanford Contractors, Inc. <br />SC Schedule Change <br />OT Other <br />Under the terms of the Contract and without invalidating the original provisions thereof, the following change(s) in <br />work is(are) authorized. <br />Eliminate stream borings (value engineering): <br />Add: 60 LF 8" Force Main - Standard Installation - STA 11+40 to STA 12+00 $2,160.00 <br />Deduct: 60 LF 8" Force Main - Boring - STA 11+40 to STA 12+00 -$8,820.00 <br />Add: 60 LF 8" Force Main - Standard Installation - STA 19+60 to STA 20+20 $2,160.00 <br />Deduct: 60 LF 8" Force Main - Boring - STA 19+60 to STA 20+20 -$8,820.00 <br />Add: 60 LF 18" Gravity - Standard Installation - STA 11+40 to STA 12+00 $4,350.00 <br />Deduct: 60 LF 18" Gravity - Boring - STA 11+40 to STA 12+00 -$18,000.00 <br />Add: 60 LF 18" Gravity - Standard Installation - STA 19+601o STA 20+20 $4,350.00. <br />Deduct: 60 LF 18" Gravity - Boring - STA 19+60 to STA 20+20 -$18,000.00 <br />NET CHANGE ORDER No. 2 -$40,620.00 <br />The contract amount is now as follows: <br />Base Contract: <br />Change Order No. 1 <br />Change Order No. 2 <br />NEW CONTRACT AMOUNT <br />Approved by: <br />$1,251,108.00 <br />$12,500.00 <br />-$40,620.00 <br />$1,222,988.00 <br />Owner - Lee County <br />Herbert A. Hincks, Chairman <br />Lee County Board of Commissioners <br />