My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda 3-6-17 Regular Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2017
>
Agenda 3-6-17 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 3:56:28 PM
Creation date
2/28/2017 5:06:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00036 <br />061 <br />LEE COUNTY, NORTH CAROLINA <br />LEE COUNTY SAN LEE PARK SANITARY SEWER SERVICE TO NATURE CENTER <br />UNIT PRICE SCHEDULE FOR NEGOTIATED PROJECT <br />ITEMS IN 'RED' HAVE BEEN CHANGED FROM ORIGINAL BID FORM - 1/4/2017 <br />r-------------------------------------- T-----------� <br />I <br />EU, INC <br />EXTENDED <br />UNE ITEM WORK ITEM DESCRIPTION EST. QUANTITY I UNIT UNIT PRICE PRICE I <br />1 1 <br />Mobilization <br />LS <br />$4,000.00 <br />$4,000.001 <br />2 <br />Clearing / Tree Removal (BY OWNER) <br />LS <br />$0.00 <br />$0.00 <br />3 <br />Select Material for Backfill <br />20 <br />Cy <br />$20.00 <br />$400.00 <br />4 <br />Undercut Unsuitable Material and Disposal <br />10 <br />Cy <br />$20.00 <br />$200.001 <br />5 <br />Partially Weathered Rods (PWR) Excavation <br />10 <br />CY <br />$50.00 <br />$500.00 <br />614 <br />-Inch Sanitary Sewer Service (PVC SDR 21) <br />958 <br />LF <br />$20.00 <br />$19,160. <br />7 <br />4 -inch DIP Cleanout w/ concrete collar <br />i <br />EA <br />$1,000.00 <br />$1,000.001 <br />8 <br />44nch PVC Cleanout w/ protector ring <br />9 <br />EA <br />$500.00 <br />$4,500.00 <br />9 <br />Connect Sewer Service to Ex. 4 -inch Sewer Service <br />2 <br />EA <br />$500.00 <br />$1,000.00 <br />10 <br />Asphalt Pavement Repair (BY OWNER) <br />0 <br />Sy <br />$100.00 <br />$0.001 <br />11 <br />Ditch Installation <br />200 <br />LF <br />$10.00 <br />$2,000.001 <br />12 <br />Ditch Liner - No. 57 Stone <br />30 <br />TN <br />$80.00 <br />$2,400.00 <br />1 13 <br />DitchUner- Class'B'Ri Rap <br />100 <br />TN ( <br />$SO.00 <br />$5,000.00 <br />1 14 <br />Temporary Check Dam w/ Weir Erosion Control) <br />1 <br />EA 1 <br />$300.00 <br />$300.001 <br />is <br />Temporary Coir Fiber Wattle Erosion Control <br />260 <br />LF <br />$3.00 <br />$7g0.00 <br />16 <br />Temporary Seeding (Erosion Control) (BY OWNER) <br />0 <br />Sy 1 <br />52.00 <br />$0.001 <br />1 I TOTAL UNIT I <br />1 1 PRICE: 541,240.001 <br />•--------------------------------------------------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.