My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda 2-6-17 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2017
>
Agenda 2-6-17 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 1:18:13 PM
Creation date
1/31/2017 1:09:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
049 <br />(a) The Lump Sum Price for Item #1 'Mobilization' may not exceed ten percent (10%) of the <br />Unit Price Bid Amount. <br />(b) Item #5 'Undercut Material and Disposal' does not include the stripping of topsoil within <br />the limit of disturbance. Item #5 will only be paid for removal of unsuitable material, as <br />determined by the Engineer, below the existing pipe trench or ditch excavation as <br />shown on the standard detail on the construction drawings. <br />(c) Excavation of Partially Weathered Rock (PWR) may be required for this project. See <br />Specification 02220 'Earthwork, Backfilling, and Compacting' for additional <br />specifications regarding rock excavation. Note that the Owner may raise the vertical <br />alignment of the sewer service line to avoid extensive rock excavation. <br />(d) The unit price for Item #6 '4 -inch Sanitary Sewer Service' shall be for the alignment and <br />profile specified in the construction drawings. However, the Owner may instruct the <br />contractor to install the pipe at a shallower depth than what is depicted in the profile (at <br />no change to any of the unit prices). <br />(e) The unit price schedule in the Bid Form shall be used in evaluating monthly progress <br />payments. <br />(f) Unit abbreviations are defined as: LS = Lump Sum; CY = Cubic Yard; CF = Cubic Feet; <br />SY = Square Yard; LF = Linear Feet; EA = Each. <br />(g) In the event the Contractor discovers an item of work not listed in the Bid Form, he shall <br />include his cost for this work in a related item listed. <br />(h) Bids shall include sales tax and all other applicable taxes, permits, bonds, fees and <br />inspection fees. Bidder understands that all costs for performing incidental work <br />necessary for the work as shown and specified, shall be included in the bid price. <br />(I) Discrepancies in the multiplication of units of work and unit prices shall be resolved in <br />favor of the unit prices; discrepancies between the indicated sum of any column of <br />figures and the correct sum thereof will be resolved in favor of the correct sum. <br />(j) Unit Prices have been computed in accordance with the General Specifications. <br />(k) Bidder acknowledges that estimated quantities are not guaranteed, and are solely for <br />the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be <br />based on actual quantities provided, determined as indicated in the contract <br />documents. <br />6. Bidder understands that the Owner reserves the right to reject any or all bids and to waive <br />formalities in the bidding. <br />7. On being awarded the Contract, the Bidder will execute Performance and Payment Bonds on the <br />forms included herein, each equal to one hundred percent (100%) of the contract price, as <br />security for the faithful performance of the Contract. <br />Lee County, NC Bid Form <br />San Lee Park Sanitary Sewer Service to Nature Center Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.