My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda 2-6-17 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2017
>
Agenda 2-6-17 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 1:18:13 PM
Creation date
1/31/2017 1:09:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04a <br />Mr. Russell Spivey <br />Bid Award Recommendation — San Lee Park Sewer Service <br />January 20, 2017 <br />Page 2 of 2 <br />• W-9 <br />• Iran Divestment Act Certification <br />The Total Unit Price Bid amount of $64,740.00 by EU, Inc. is 30% higher than my Engineer's Estimate <br />for the Construction Cost ($49,660.00). Because the bid amount exceeds the Engineer's Estimate by <br />a significant margin, it was decided to not accept the bid and enter into negotiations with EU to <br />review options to reduce the project scope and cost. EU agreed to reevaluate their unit prices after <br />our initial negotiations meeting. EU proposed a reduction of $10,500 in unit prices, reducing the <br />Total Unit Price amount from $64,740.00 to $54,240.00. In an effort to further help reduce the <br />project cost, it was agreed the County would provide the 'Clearing / Tree Removal' ($9,000 line <br />item), the 'Asphalt Pavement Repair' ($2,000 line item) and the 'Temporary Seeding' ($2,000 line <br />item) separately. The final proposed contract amount has been negotiated for a Total Unit Price <br />amount of $41,240.00. <br />ELJ, Inc. is a licensed Public Utilities Contractor in the State of North Carolina and based in <br />Jacksonville, NC. ELJ recently completed two projects for Lee County: 1) OT Sloan Park Sanitary <br />Sewer Rehabilitation and 2) Government Center Waterline Replacement. Both projects were <br />completed in a satisfactory manner. <br />If the County determines it has the funds available to proceed with this project, I hereby recommend <br />award of the negotiated project to ELJ, Inc. for the negotiated Total Unit Price Amount of $41,240.00. <br />Please keep in mind that the proposed contract amount is 'unit price' and the final cost will depend <br />on the actual units installed plus any change orders that may be necessary. A 20% contingency is <br />advised for this project. If you have any questions, please contact me at your earliest convenience. <br />Sincerely, <br />J Thomas Engineering, Inc. <br />Jeremy U.' -°Y <br />�g�me�ln9 M«u, <br />Thomas` °m"'„'mxm97 <br />on.:onoi.:o u.mra usw <br />Jeremy R. Thomas, P.E. <br />President <br />Enclosures: EU Bid Package <br />Bid opening certification <br />Bid tabulation <br />Unit Price Schedule for Revised Project <br />,J Thomas j✓n ineerinYy Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.