My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-16 Reg. Meeting
public access
>
Clerk
>
MINUTES
>
2016
>
11-21-16 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 2:44:10 PM
Creation date
12/9/2016 2:43:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AQUATIC DESIGNS, INC. <br />6328 Monnett Rd., P.O. Box 327, Climax, North Carolina 27233 <br />(336)674-7665 <br />REPORT <br />Mr. John Crumpton 10-13-16 <br />County Manager <br />106 Hillcrest Drive <br />Sanford, NC 27331 <br />RE: O.T. Sloan Pool <br />2303 Tramway Rd <br />Sanford, NC 27331 <br />Mr. Crumpton: <br />The intent of this report is to provide you with options of consideration to provide competitive <br />swimming at the O.T. Sloan recreation pool. We have visited the site to evaluate all options we <br />feel are viable. At the time of our visit the pool was full and operating in normal conditions. <br />Provided is a brief description, duration and estimated cost for each. Each option by itself will <br />provide the desired goal of competitive swimming meeting the regulations previously discussed. <br />Option 1: Deepen pool at west end of pool to approximately 4'3". <br />Demo: <br />This option would require removal of decking approximately 4' in width at the shallow end wall <br />and approximately 50' down each side. Removal of the pool floor and wall structure within the <br />same parameter would also be required. Removal of all existing plumbing within this area. <br />New Work: <br />New engineered drawings would be required for submittal to the health department. These <br />drawing would reflect the new plumbing, pool structure, decking, along with all standard <br />construction details as required by code and as needed for construction. Miscellaneous items <br />would include access, protection and other general conditions. <br />Schedule: Engage designer, engineered drawings, specifications, bidding process, contracts and <br />construction is estimated at a minimum of seven to eight months. <br />Estimated cost for option 1: $210 to 230k <br />
The URL can be used to link to this page
Your browser does not support the video tag.