My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda - 9-19-16 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2016
>
Agenda - 9-19-16 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:41:09 AM
Creation date
9/13/2016 8:36:42 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
041 <br />connections, attachments, reinforcements, and anchorage; and deck details, edge conditions, and ext ytt of finish <br />flooring within arca where units are to be installed. <br />1- Show installation details at non-standard conditions. Furnish floor layouts, technical and installation manuals for <br />every trait shipped with necessary dimensions for rail layout and system configuration at the project site. Include <br />installed weight, load criteria, furnished specialties, and accessories. <br />2. Provide layout, dimensions. and idcnrilicntinu of caclt unit corresponding to sequence of installation and erection <br />Procedures. SpecificttUy include the following: <br />(u) lavation, r"I"on avid contigWJtionofiracks on all floors. <br />(b) Plan layouts ofpositiors ofcatriagcs, including all required clearances. <br />(c) Details ofshelving, indication mahud and configuration of installation in carriages. <br />3. Provide location and details of anchorage devises to be embedded in or fastened to Other construction. <br />4. Provide installation schedule and complete erection procedures to ensure proper installation. <br />C. Samples: Provide minimum 2" square sample of each color on actual substrate for each exposed component. <br />D. installer Certificates: Furnish signed certification by manufacturer attesting dial installers comply with specified <br />requirements. Submit manufacturer's certification that products comply with requirements of the contract documents <br />E. Warranty: Suhmit draft copy ofproposed w:vtanty Ivor rceiety by architect. <br />F. Maintenance Data: Provide in form suitable for inclusion in maintenance manuals for mobile storage units. Data shall <br />include operating and maintenance instructions, parts inventory listing, purchase source listing, emergency instructions, <br />and related information. <br />i. Submit manulacturer,s instructions for proper maintenance materials and procedures. <br />2. Submit manufacturer's pruned instructions for maintenance of installed work, including methods and frequency <br />recommended for maintaining optimunm condition under anticipated use conditions. Include precautions against <br />using materials and methods which may be detrimental to finishes and performance. <br />1-; QUALITY ASSURANCE <br />A. specifier Qualiproducts <br />ons -r i Engage ca experienced installer rule is a manufacturer's authorized representative for the <br />specified pnducu for installing carriages and anchoring shelving units to ttrriapes. <br />1 • Minimum Qualifications: Not less than five yeah oferpericnee inslalting systems of comparable size and <br />complexity to specified project requirements. <br />1.4 DELIVERY. STORAGE AND HANDLING <br />A. 1*0110'ntarmuftacturer's instructions and recommendations for delivery, storage and handling requirements. <br />1.5 PROJECT CONDITIONS <br />A. Field M msurements: Verify dimensions before tahrication. Indicate verified measurements oil shop drawings. <br />Coordinate fabrication and delivery to cpsure no delay in progress of the work. <br />B. Established Dimensions: Where field measurements cannot be made without delaying the work, establish dimensions <br />and proceed with fabricating mobile storage units. Coordinate construction to ensure actual dimensions correspond to <br />established dimensions. <br />1.6 SEQUENCING AND SCHEDULING <br />A. Sequencing: Coordinate storage shelving system installation with other work to minimize possibility of damage and <br />soiling during remainder of construction period. <br />B. Scheduling: Plan installation to commence after ftni.Jming operations, including painting have been completed. <br />C. Built -In Items: Provide components which must he built in at a time which eattscs no delays in general progress of the <br />,vork. <br />D. Pre -installation Conference: Schedule and conduct amference on Project site to review methods and procedures Cor <br />installing mobile storage units including, but lint limited to, the following• <br />1. Review project conditions and levelness of flooring and other preparatory work Performed under other contracts. <br />[2] <br />
The URL can be used to link to this page
Your browser does not support the video tag.