My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda - 8-15-16 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2016
>
Agenda - 8-15-16 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2016 11:40:14 AM
Creation date
8/9/2016 11:36:13 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />14. To communicate the library's goals and objectives (5 Year Plan), and progress toward meeting them, <br />regularly to the public, staff and to the library's governing authority. Speak to local service groups like the <br />Rotary Club, Lion's Club, Day Kiwanis Club and Evening Kiwanis Club. <br />a. To post long-range and annual goals and objectives on the website after Board discusses and <br />votes. (2016-2021) Goals reviewed annually. <br />b. Director report monthly using the Annual Plan as a guide, to Boards, FOL group and the <br />general public through regular board meetings, meetings of county and town councils, reports in <br />the local newspapers, monthly newsletter, and on the Regional Library website on activities and <br />achievements. (2016-2021) <br />c. To engage the community in the planning process. <br />i. To conduct a client survey annually (2016-2021) <br />ii. To provide a suggestion box at each library, a telephone <br />number and email where any suggestions, criticisms and <br />problems can be reported. (2016-2021) <br />iii. The Library Director will continuously monitor needs and accept feedback during board <br />meetings and other gatherings of community service groups and citizens and report on <br />progress at the library to achieve library mission. (2016-2021) <br />iv. Research ability of library to be open more nights and all day Saturday due to <br />community request. <br />d. To ensure the long-range plan is accessible to library staff and the public. <br />e. To post the current and revisions of the 5 Year Plan and annual plans <br />on the library website. 15. <br />To provide a clean well-designed interior in good repair that encourages self-directed and group use of <br />the library, supports staff efficiency, and promotes eco -friendly practices. <br />a. Current and ongoing operational policy reflecting keeping the library furnishings in good <br />condition. (2016-2021) <br />b. To engage local library staff and Board of Trustees in a dialog to determine the space and <br />utilization needs of each library as well as money required for upkeep, changes, and renewal. <br />(2016-2021) <br />c. Remove broken items form asset list and dispose of per county rules. <br />d. Use signage that offers information at the point of need and frames that information from the <br />customer perspective. <br />e. To review all signage in each library. (2016-2018) <br />f. To include signage review on an annual "to consider" checklist. <br />g. To review eco -friendly practices/green practices of Lee County and the Library and develop <br />written policy statements for the Library department to guide them. (2016-2021) <br />h. Policies to be written from current practices during Fall 2016. <br />i. Find low cost ways to freshen up the children's room <br />i. Replace or repair partitions that have tears <br />j. Facilities inspection of main library to be made quarterly and coordinate repairs with General <br />Services <br />i. In FY2016-2017 investigate repair options and possibility of writing USDA grant for <br />skylight repair to find permanent solution to the rain leaks, sun glare and heat. Check <br />status on CIP list for FY 2017-2018. Skylight was removed from top of list in 2016-2017. <br />16. Consideration of grounds and exterior committee to be formed to do an annual inspection in February. <br />Input will be solicited at each spring Board meeting. <br />a. Crepe Myrtle tree on Hawkins street side needs to be cut down. New landscaping to be <br />completed on Hawkins St. side Fall 2016. <br />17. To meet current safety and fire codes, and be accessible to all members of the community, <br />conforming to American with Disabilities Act (ADA) Standards. In progress <br />a. To review each library for compliance. (2016-2021) Investigate ways to be ADA compliant <br />b. To fully meet the requirements of the ADA Standards. (2016-2021) <br />c. Main library and Broadway are in compliance with safety and fire codes in all areas. <br />d. A videophone for the deaf installed at the main library. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.