My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 - 07-19-10 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2010
>
2010 - 07-19-10 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2010 7:58:32 AM
Creation date
8/20/2010 7:57:22 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 23 PAGE 608, <br />M0" PAWN& A*, v&- <br />5415 Fayetteville Road <br />Raleigh, NC 27603 <br />Phone 919-329-7300 <br />Fax 919-329-7301 <br />email.kevin@rdupaving.com <br />www.rdupaving.com <br />NCDOT Certified Subcontractor & WEE <br />NC License 62537 <br />PROPOSAL <br />Company: Lee County General Services <br />Attention: Mr. Joseph Cherry <br />St. Address 106 Hillcrest Drive <br />city, St_. zip Sanford, NC 27331 <br />Phone (919) 718-4622 <br />Fax (919) 774-6526 <br />From: Kevin Flynn <br />Change Order Request #1A <br />Date: July 1, 2010 <br />Project Name: Colon Road Convenience Center Resurfacing <br />Project Location: Sanford, NC <br />The following proposal is in reference to the job name listed above: <br />Undercut Quantity Unit <br />Unit Price Total <br />Undercut of unsuitable material 6530 cy <br />$118.33 $7,726.95 <br />' Remove existing unsuitable material and dispose on site in 4 areas <br />' Furnish and install new Crushed Aggregate Base Course <br />' Area measurements <br />1)15'x 30'x 2' <br />2) 13'x 38'x 1' <br />3)19'x 20'x 1' <br />Geogrid Stabilization 1 ea $1,100.00 $1,100.00 <br />' Furnish and install Goegns BX 1100 Stabilization Grid as directed by Geotechnical Engineer <br />Total if all above accepted: 58,826.95 <br />Terms & Exclusions <br />1) Price includes 1 mobilization for stone and 1 for paving, each additional $1,250.00. <br />2) Price excludes- testing, inspections, permits, fees, bonds, as-built drawings, proof rolling of subgrade, maintenance oflydffc, saw <br />cutting of any materials, heavy pavement cleaning, prime coal, herbicide, dewatering, c repairs of damages caused by others and any <br />work not listed above. <br />3) Quantities above are deemed to be correct, should any corrections be necessary actual field measurements will provide cost. Material <br />used for the project above are all guaranteed to the product specifications. <br />4) Work will be performed and completed in a workmanlike manner. <br />5) RDU Paving, Inc employees are all fully insured under workman's compensation and general liability. <br />e) This proposal expires within 30 days of this proposal date, but may be accepted at a later date at our option. <br />72 Payment d in full upon completion of work. <br />82 This proposal excludes anything of specifically listed above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.