My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda - 1-4-16 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2016
>
Agenda - 1-4-16 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 8:57:04 AM
Creation date
12/29/2015 8:54:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of Other Cost Items <br />060 <br />Aside from costs associated with renovations to existing facilities, the DPI 2015-2016 Facility Needs <br />Survey requests information related to the following categories: <br />Furniture and Equipment - $5,393,486 <br />A large portion of the total cost is a result of amounts automatically inserted for furniture and equipment <br />directly related to new construction which totals approximately $4.2M. Aside from new construction, <br />funding is needed throughout the district for replacement of classroom, media center, and cafeteria <br />furniture for an approximate amount of $835K most of which was prioritized in years 3-5. Costs <br />associated with equipment needs in kitchens amounted to an approximate total of $400K also <br />prioritized in years 3-5. <br />New Schools - $41,684,176 <br />Costs for two new elementary schools were determined by entering information into worksheets <br />provided with the DPI 2015-2016 Facility Needs Survey. For the purposes of this report, the schools <br />were named "First New Elementary School" and "Second New Elementary School." <br />The First New Elementary School is designed for 110,000 sq.ft. with a capacity of 900. Base -line costs <br />per square foot are calculated at $194/sq.ft. bringing the project total for construction to $23,687,494. <br />Furniture and Equipment for the First New Elementary School is calculated at $2,072,423 resulting in <br />$25,759,917 total cost. <br />The Second New Elementary School is designed for 83,573 sq.ft. with a capacity of 700. Base -line <br />costs per square foot are calculated at $194/sq.ft. bringing the project total for construction to <br />$17,996,682. Furniture and Equipment for the Second New Elementary School is calculated at <br />$1,597,777. This cost of the Second New Elementary School also includes $1,950,000 bringing the <br />total cost estimate to $21,544,459. <br />The projects are recommended for construction in Years 3-5. <br />Additions — $5,994,212 <br />Costs for two additions were determined by entering information into worksheets provided with the DPI <br />2015-2016 Facility Needs Survey. Approximate costs of $2.8M for a new gymnasium at Bragg Street <br />Academy was determined by utilizing the worksheets in the state forms. Additional costs for the project <br />in the amount of $200K is included in the "Furniture and Equipment" section of the report bringing the <br />project total to $3M. The project is recommended for construction in Years 3-5. <br />Approximate costs of $3.2M for a new auditorium at Southern Lee High School was determined by <br />utilizing the worksheets in the state forms. Additional costs for the project in the approximate amount of <br />$300K are included in the "Furniture and Equipment" section of the report bringing the project total to <br />$3.5M. The project is recommended for construction in Years 3-5. <br />Land - $1,950,000 <br />A requirement for land to build one of the two new elementary schools was estimated at 30 acres. <br />Land cost per acre was estimated at $65,000 per acre. The specific location has not been determined. <br />AIBAISCA <br />00Ydmg Asset Inventory <br />Single Component Assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.