My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda - 1-4-16 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2016
>
Agenda - 1-4-16 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 8:57:04 AM
Creation date
12/29/2015 8:54:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
058 <br />Building Exterior/Structure - $6,965,400 <br />This category comprises 26% of the total estimated renovation costs. Significant project groups include: <br />Roofing <br />At an approximate total cost of $3.2M, 25% of the elementary schools and one high school project are <br />designated for roof replacements primarily in years 6-10. <br />Window Replacements <br />Approximately $1.8M is estimated for a window replacement project at East Lee Middle to be <br />completed in years 3-5. <br />Exterior Doors <br />Approximately $1 M is estimated for exterior door replacement projects at East Lee Middle and West <br />Lee Middle Schools, each to be completed in years 3-5. <br />Building Interior — $714,780 <br />This category comprises 3% of the total estimated renovation costs. Significant project groups include: <br />Painting <br />Costs related to scheduled exterior and interior painting for all schools and support facilities in the <br />district are estimated at $325K. Priorities are equally split between years 3-5 and years 6-10. <br />Restroom Partitions <br />Two middle schools, East Lee and West Lee are listed for replacement of restroom partitions at a total <br />approximate cost of $240K. Both projects are prioritized for years 3-5. <br />Plumbing/HVAC/Electrical - $5,891,862 <br />This category comprises 22% of the total estimated renovation costs. Significant project groups include: <br />Heating, Ventilation, and Air Conditioning <br />HVAC projects are listed throughout the district totaling approximately $5.7M, most of which are called <br />for in years 3-5. This total includes boiler replacements $200K, chiller replacements $210K, cooling <br />tower replacements $200K. West Lee Middle School is designated for HVAC replacement at an <br />approximate cost of $1.7M in years 3-5. Lee County High School is listed for an HVAC upgrade <br />estimated at $1.5M prioritized in years 3-5. A replacement of water heaters at approximately half of the <br />elementary schools is estimated at a total approximate cost of $110K with all projects prioritized in <br />years 3-5. <br />Electrical <br />Each of the alternative schools are listed for electrical service upgrades totaling approximately $100K in <br />years 3-5. <br />A district -wide initiative to upgrade parking lot lighting to LED fixtures as an energy conservation <br />measure is estimated a total cost of $100K with most projects occurring in years 6-10. <br />Technology cabling needs to be upgraded to fiber and access points need to be expanded throughout <br />the district at a total approximate cost of $300K most projects scheduled for years 3-5. Lee County High <br />School is designated for wireless connectivity equipment at an approximate cost of $200K in years 3-5. <br />Southern Lee High School is listed for upgrades of technology cabling and switches at an estimated <br />cost of $90K. This project is prioritized for years 1-2 <br />50DAISCA <br />Building Asset Inventory <br />Angle Component Assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.