My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda - 1-4-16 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2016
>
Agenda - 1-4-16 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 8:57:04 AM
Creation date
12/29/2015 8:54:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of Renovations Data <br />The following chart indicates a breakdown of renovation csts align with values n the stat s by categories establhed in the Dreport. <br />PI <br />2015-2016 Facility Needs Survey. Category level renovation <br />Costs associated with significant projects detailed in the summary are listed as "approximate" as they <br />have been rounded and in some cases combined into project groupings. <br />$1, <br />Renovation Costs by Category <br />Total $26,883,822 <br />.4,780 1W Site Improvements <br />hi Building Exterior Structure <br />* Building Interior <br />plumbing HVAC Electrical <br />Li Bldg. Code Life Safety <br />a Other Renovations <br />$55,860 <br />057 <br />Site Improvements - $1,695,180 <br />This category comprises 6% of the total estimated renovation costs. Significant project groups include: <br />Pavingro ects that total approximately $600K <br />25% of the elementary schools are designated for paving p 1 <br />spread evenly between years 1-10 with most projects recommended in years 3-5. <br />Grading/Drainageschool, most of the approximate total cost of <br />With the exception of one small project at an elementary <br />$370K for grading and drainage projects is for a single project at the Heins Education Building. <br />Fencingro ects that total approximately $200K <br />25% of the elementary schools are designated for fencing p j <br />spread evenly between years 3-5 and years 6-10. <br />Sewer a lift station to pump sewage <br />One project at Greenwood Elementary totaed$b2the fHealth Department. This project is scheduled for <br />to the nearest municipal sewer line mandat y <br />years 3-5. <br />4 JABAISCA <br />&"ng Asset Inventory <br />Single Component Assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.