Laserfiche WebLink
List of "New" Protects Recommended by TARPO Prioritization Subcommittee* <br />HIGHWAY <br />(12 New Projects; an additional project, the Western Connector, may have a new alignment/concept <br />submitted to replace an existing carry-over project) <br />I. NC 751 widening project, from US 64 to O'Kelly Chapel Road <br />2. Pittsboro-Moncure Rd modernization project, from US 15-501 to Old US 1 <br />3. US 64 median/sidewalk/bike lane project, from Greensboro Ave to Stockyard Rd <br />4. US 1 superstreet improvements in Southern Pines and Aberdeen, from Old US 1 to Roseland Rd <br />S. NC 24-27 & NC 22 intersection improvement in Carthage <br />6. Efland-Cedar Grove Rd modernization project, from Highland Farm Rd to north of Carr Store Rd <br />7. Old Greensboro Rd modernization project, from Jones Ferry Rd to Alamance County line <br />B. Orange Grove Rd/Buckhom Rd modernization project, from Dairyland Rd to West Ten Rd <br />9. Kelly Drive realignment at Central Carolina Community College in Sanford <br />10. NC 78 widening project, from US 1 to Lemon Springs Rd <br />11. US 15-501 widening project, from Pinehurst Traffic Circle to NC 22 south of Carthage <br />12. Colon Rd modernization and widening, from US 421 Bypass to Deep River Rd <br />13. **Pinehurst Westem Connector, if there is agreement on a new alignment/corridor/concept for <br />this project (this would replace the current Western Connector project on the carry-over list)** <br />BICYCLE AND PEDESTRIAN <br />(13 New Projects; the 13th will become eligible by the removal of an existing carry-over project on <br />Orange Grove Rd in Orange County) <br />I. Hamlets Chapel Rd/Jones Ferry Rd bike lane project, from US 15-501 to Orange/Chatham line <br />2. Improvements to sidewalk ramps, crosswalks, and pedestrian crossings at railroads at 8 <br />locations in Downtown Siler City <br />3. N Chatham Ave sidewalk project, from Craven St to town limits of Siler City <br />4. 2nd Ave road diet/bike/ped project, from Greensboro Ave to Fayetteville Ave in Siler City <br />5. E 3rd St sidewalk project, from US 64 to N 5ti' Ave in Siler City <br />6. Midland Rd road diet project, from Pinehurst Traffic Circle to Clark St <br />7. Johnson St sidewalk project, from US 15-501 to Southern Middle School in Aberdeen <br />B. Improvements to pedestrian crossings at railroads at 3 locations In Downtown Aberdeen <br />9. Little Buffalo Creek Greenway in Sanford, from Charlotte Ave to City Hall <br />10. Woodland Ave sidewalk project, from Evergreen Ln to Globe St in Sanford <br />11. Fields Drive sidewalk project, from Horner Blvd to Carthage St In Sanford <br />12. S Main St sidewalk project, from Mansfield Dr to 100 block of Main St in Broadway <br />13. Carthage St road diet project, from Wicker St to Chatham St in Sanford <br />•A~drmW was made to the Highway 8+tfang the Committee meeting, when staff mal&W one of the proposed new projects (on <br />NC87/n Madam County) was octuo8y aheody a cony-ouer project Staff recommends adding the Colon Rd project in Its place, which was <br />mother~ that had been discussed by thecommittee <br />