Laserfiche WebLink
BOOK 8 PACE305 <br />SECONDARY ROAD IMPROVEMENT PROJECTS <br />LEE COUNTY <br />1. SR 1199 [Peach Orchard Road] from SR 1179 to SR 11$8 - 1.1 miles <br />PROPOSED IMPROVEMENT: Preliminary engineering and survey, right-of-way <br />acquisition, grade, drain, base, pave and <br />erosion control. <br />Estimated Cost: $32,000.00 <br />Priority Number 1 <br />2. SR 1140 (Frank Wicker <br />PROPOSED IMPROVEMENT: <br />Estimated Cost: $30,01 <br />Priority Number 3 <br />Road] from NC 87 to SR 1144 - 1.3 miles <br />Preliminary engineering and survey, right-of-way <br />acquisition, grade, drain, base, pave and <br />erosion control. <br />)0.00 <br />TOTAL PROPOSED PROGRAM:. $62,000.00 <br />