My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 6-16-14 Reg. Meeting
public access
>
Clerk
>
MINUTES
>
2014
>
Minutes - 6-16-14 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2014 8:26:30 AM
Creation date
7/25/2014 8:23:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK - 00026 PG - 0697 <br />The General Contractor or the person that the Building Permit was issued to must make all inspection requests. <br />(Footings, Foundations, Rough -Ins, Insulation, and Final for C.O.). Electrical, Plumbing & Mechanical Contractors <br />will be responsible to notify the General Contractor when ready for Rough -In, Final, and other inspections. <br />"NOTE: When a construction project requires all four disciplines i.e., Building, Electrical Plumbing and <br />Mechanical installations, each discipline will be inspected simultaneously, during one inspection trip Inspection <br />requests should not be made unless each discipline is ready for a rough -in inspection. <br />A minimum of one (1) day notice is required for all inspections. <br />All inspections must be called in by the correct address and permit number. <br />Building Permit Cards must be posted and building plans must be available at the jobsite or the inspection will not be <br />performed and a $60 PENALTY FEE WILL BE CHARGED. <br />Inspection results will be provided at all jobsites. Passed inspections will be indicated with the appropriate section of <br />the permit card posted on the jobsite. Failed inspections will be identified with the posting of a orange "NOTICE" <br />card accompanied by a "NOTICE OF ADDITION OR CORRECTIONS" sheet. The Inspector will provide these two <br />documents on the jobsite with the permit card. (G.S.§ 153A -352 and G.S.§ 160A -512). <br />Calls to the inspection department concerning the status of inspections are discouraged. Check permit card at jobsite <br />for inspection results. <br />Priorities for daily inspections will be as follows: <br />1. Concrete pours. (i.e. footing and slabs). <br />2. Open ditches that are a potential danger to the public. (i.e. water & sewer lines and underground electrical) <br />3.. Foundations. <br />4. Restoration of Electrical Service to existing buildings. <br />5. Mechanical Change -Outs / Repairs during extreme weather conditions. <br />RE- INSPECTION FEES <br />The Inspections Department will perform one follow -up inspection to ensure that corrections have been made. <br />Additional inspections shall be termed "re- inspections ". A fee of $60 shall be paid prior to any re- inspection trip. <br />Temporary service poles not inspected in conjunction with footing or foundation inspections will be considered a re- <br />inspection. There will be a $60.00 re- inspection fee charge if a scheduled inspection is not ready when the inspector <br />arrives on the jobsite. <br />Any inspection that requires that the owner provide access (i.e. Building, Electrical, Mechanical and Plumbing) the re- <br />inspection fees will be as follows: <br />• 1St Inspection Trip - No Charge. Door Hanger will be left instructing owner to schedule an inspection. <br />• 2nd Inspection Trip, and subsequent trip will result in a $60 Re- Inspection Fees per Re- Inspection Trip until <br />Inspection is approved. Contractor will be responsible for paying Re- Inspection Fees prior to any Re- <br />Inspections. <br />PAPCWWMftW09SdVW-W 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.