My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 6-16-14 Reg. Meeting
public access
>
Clerk
>
MINUTES
>
2014
>
Minutes - 6-16-14 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2014 8:26:30 AM
Creation date
7/25/2014 8:23:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK - 00026 PG - 0685 <br />BUILDING PERMIT FEES <br />COMMERCIAL <br />COMMERCIAL <br />New <br />50,000 Square Feet and Less. <br />Building Permit Fee: <br />Estimated Cost of Construction shall be determined by multiplying the total gross building <br />square footage by the cost per square foot for Type of Occupancy listed below; <br />Permit Fee = Estimated Cost of Construction from above divided by $1,000, multiplied by $2 <br />Building Permit Fee: <br />Assembly <br />$100 <br />Business <br />$85 <br />Educational <br />$100 <br />Facto Industrial <br />$100 <br />Hazardous <br />$100 <br />Institutional <br />$120 <br />Mercantile <br />$100 <br />Residential <br />$100 <br />Storage <br />$50 Heated <br />$45 Unheated <br />Utility and Miscellaneous <br />$50 Heated <br />$45 Unheated <br />Mixed Occupancy <br />Highest Cost per Sq.Ft. of Occupancy Types <br />COMMERCIAL <br />50,000 Square Feet and More. <br />New <br />Building Permit Fee: <br />Estimated Cost of Construction shall be determined by: <br />1. Multiplying the first 50,000 square feet of the total building gross square footage by <br />the cost per square foot for Type of Occupancy listed below. <br />2. Multiplying the square footage in excess of 50,000 square feet by the cost per square <br />foot for Type of Occupancy listed below and add to figure from above. <br />Permit Fee = Estimated Cost of Construction (from 1 above), divided by $1,000, <br />multiplied by $2 <br />Plus <br />Estimated Cost of Construction from 2 above), divided by $1,000, multiplied by $1. <br />Assembly <br />$100 <br />Business <br />$85 <br />Educational <br />$100 <br />Facto Industrial <br />$100 <br />Hazardous <br />$100 <br />Institutional <br />$120 <br />Mercantile <br />$100 <br />Residential <br />$100 <br />Storage <br />$50 Heated <br />$45 Unheated <br />Utility and Miscellaneous <br />$50 Heated <br />$45 Unheated <br />Mixed Occupancy <br />Hi hest Cost per Sq.Ft. of Occupancy Types <br />PAPV —Ve kSWftSChW -03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.